Laserfiche WebLink
Subtask S.2 - Locate Test Holes: Assuming FDOT horizontal and vertical control provided, <br />CONSULTANT shall locate individual test holes as identified in Subtask EA and provide an X, Y <br />and Z location relative to the baseline. Test hole locations are to be used with test hole reports in <br />verifying location of existing utilities. Services assume 125 test holes within the 2.2 mile Collins <br />Avenue right -of -way. <br />Engineering Services: <br />Subtask EA - Convert FDOT file format: CONSULTANT must convert files prepared for FDOT <br />in MicroStation to AutoCADD for use by FP &L. In doing so, CONSULTANT must manipulate and <br />apply layer management to clean -up and prepare files for intended use. <br />Subtask E.2 - Input Existing Utilities: The intent of this task is to locate existing features with a <br />reasonable degree of accuracy so that proposed improvements can be designed to avoid conflict. <br />Using test -hole information, In combination with plans, as- builts, and mark -ups from the individual <br />utility providers, CONSULTANT shall input horizontal and vertical information into base -file for use <br />in design plans. Once complete (existing information compiled and input) the base -file will be re- <br />circulated to utility providers to ensure existing utilities are property represented. Minor corrections <br />and details are expected. <br />Subtask E.3 - Utility Test - holes: To ensure the accuracy of existing conditions, specific utilities <br />will be physically located and identified with exact vertical and horizontal location designated. <br />Test -hole locations shall correlate with critical crossings as determined by CONSULTANT. <br />Because the nature of determining locations is dependent upon proposed design, the number of <br />test -holes required is unknown. For purposes of establishing a unit price per test -hole, <br />CONSULTANT assumes up to 125 test -holes may be required. <br />TASK 2 - Prepare Underground Improvements Plan (30 %): <br />Subtask EA - Prepare Underground Plan: Utilizing completed base -isle, CONSULTANT shall <br />prepare plans for the components necessary for undergrounding of utilities. With the exception of <br />FP &L (which will follow once design is made available) individual requirements of each utility will <br />be identified and incorporated into proposed design. CONSULTANT- shall coordinate underground <br />conduit needs, locations, structure sizes, and above -ground equipment. In addition, <br />CONSULTANT shall identify proposed easements required to accommodate additional above - <br />grade conditions. CONSULTANT assumes all underground features to be located within the <br />existing right -of -way. <br />KEITH and SCHNARS, P.A. <br />ENGINEERS, PLANNERS, SURVEYORS <br />Professional Services Agreement <br />Project Name: lAility Undergrounding Consulting - Phase II <br />Project Location: Sunny Isles Beach, FL <br />K &S Proposal No.: P5098.MK <br />Revised June 4, 2013 Page 4 <br />