My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2013-2172
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2013
>
Reso 2013-2172
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 2:56:50 PM
Creation date
12/23/2013 2:51:44 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2013-2172
Date (mm/dd/yyyy)
12/19/2013
Description
2nd Amd to Agmt w/Keith & Schnars: Utility Undergrounding Consultant Srvs Phase II
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.0 SCOPE OF SERVICES <br />This Work Authorization includes both survey and engineering services. The enoin =_erino services relate to <br />the expanded service areas outside of the Collins Avenue right -of -way and include research of existing <br />utilities, plans preparation, incorporating FP &L design, identifying required easements, defining and <br />coordinating design requirements of utility providers. <br />The survey services can be grouped into two categories, those required across the entire project, and <br />those related only to the expanded service area off - Collins. Services required for the entire project relate <br />to obtaining easements for placement of additional equipment needed for undergrounding. <br />Survey services for the expanded service area (off - Collins) include Specific Purpose Survey, Right -of -way <br />Verification, and additional Test Holes locates. To minimize scope, CONSULTANT shall utilize CAD files <br />Provided with FP &L design files where applicable_. In doing so, the CONSULTANT shall verify existing <br />right -of -way only and incorporate into FP &L files thereby ensuring proper location of proposed <br />improvements and easements. Where the FP &L design corridor deviates from the right -of -way, a more <br />detailed Design Survey is required to tie -down proposed improvements and easements as well as identify <br />existing site features. <br />TASK 1 — Preoare Base File <br />Survey Services: <br />Subtask S.3 — Proposed Easement Sketch & Descriptions: Undergrounding of overhead <br />services will result in additional pad - mounted equipment. Due to space restrictions and clear -zone <br />requirements, most of this equipment will be located outside of the right -of -way within private <br />properties. CONSULTANT shall prepare a Sketch and Description for each proposed site. Until <br />defined through design, the number of easements required and specific locations can only be <br />assumed. Services assume an estimate of sixty (60) Sketch and Descriptions. <br />Subtask SA — Design Survey of Proposed Easement Sites: To enable sighting of above -grade <br />improvements outside of the right -of -way (mostly above -grade equipment) additional survey will be <br />required to identify existing improvements and property lines. Placing equipment within private <br />properties assumes a Design Survey required approximately 25'x25' in the area proposed. <br />CONSULTANT shall perform a Design Survey at each specified area. CONSULTANT assumes <br />horizontal and vertical control provided near the specified sties. Services assume an estimate of <br />sixty (50) sites. <br />The FDOT survey includes only what is between the east and west right -of -way. CONSULTANT <br />0 <br />KEITH and SCHNARS, P.A. <br />ENGINEERS, PLANNERS, SURVEYORS <br />Professional Services Aoreement <br />Project Name: Utility Undergrounding Consulting - Phase II <br />Project Location: Sunny Isles Beach, FL <br />K &S Project No. 18073.00 Arrencirnem No. 1 <br />November 19, 20! 3- Page2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.