Laserfiche WebLink
ACCESS CONTROL SYSTEM SYMBOLSELECTRONIC SAFETY AND SECURITY ABBREVIATIONS <br />CR <br />RX <br />ACP <br />SECURITY COMM SYSTEMS SYMBOLS <br />AA <br />EL <br />TN <br />ELR <br />PP <br />PB <br />PS <br />TH <br />ADO <br />ML <br />DC <br />CARD READER <br />PIR REQUEST-TO-EXIT <br />ACCESS CONTROL PANEL -SHOWN FOR COORDINATION ONLY <br />DOOR CONTACT <br />AUDIBLE ALARM <br />OPTICAL TURNSTILE <br />ELECTRIFIED LOCK <br />AUTOMATIC DOOR OPERATOR <br />MAGNETIC LOCK <br />ELECTRIC LATCH RETRACTION <br />ADO PUSH PLATE <br />DOOR RELEASE PUSH BUTTON <br />LOCAL LOCK POWER SUPPLY <br />ELECTRIC TRANSFER HINGE <br />JB 8x8x6 NEMA 1 JUNCTION BOX WITH SCREW COVER <br />BL BLUE LIGHT PHONE CALL POINT <br />ES ELECTRIC STRIKE <br />I/O ACS INPUT/OUTPUT PANEL <br />VI VIDEO INTERCOM DOOR STATION <br />IC VOICE ONLY INTERCOM DOOR STATION <br />SECURITY RACEWAY REQUIREMENTS GENERAL NOTES: <br />1.SECURITY DETAILS ARE DIAGRAMMATIC AND INTENDED FOR OWNING THE SCOPE OF THE <br />SYSTEMS AND REQUIREMENTS, ALL FINAL INSTALLATIONS SHALL BE BASED ON APPROVED <br />SHOP DRAWINGS. <br />2.CONTRACTOR SHALL PROVIDE DETAILED SHOP DRAWINGS INDICATING FINAL CABLING AND <br />CONDUIT SIZES AS COORDINATED WITH APPROVED SHOP DRAWINGS PRIOR TO ROUGH-IN <br />3.PRIOR TO ROUGH-IN, CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS, RCPs, <br />ELEVATIONS AND SCHEDULES FOR ALL FINAL MOUNTING HEIGHTS AND LOCATIONS. <br />4.THE CONTRACTOR SHALL PROVIDE DETAILED COORDINATION DRAWINGS FOR SUBMITTAL TO <br />ENSURE THAT ALL SIZES, AND SYSTEMS ARE COORDINATED WITH ALL TRADES AND <br />SYSTEMS. <br />5.INSTALLATION OF ALL RACEWAYS SYSTEMS SHALL BE PROVIDED IN ACCORDANCE WITH <br />REFERENCED STANDARDS NOTED IN SPECIFICATIONS AND CONTRACT DOCUMENTS HEREIN. <br />A AMPERES <br />AC ALTERNATING CURRENT <br />ACS ACCESS CONTROL SYSTEM <br />ACP ACCESS CONTROL PANEL <br />A/D ANALOG TO DIGITAL CONVERSION <br />ADA AMERICANS WITH DISABILITIES ACT <br />ADO AUTOMATIC DOOR OPERATOR <br />AER AERIAL <br />AFF ABOVE FINISHED FLOOR <br />AIA AMERICAN INSTITUTE OF ARCHITECTS <br />AM AMPLITUDE MODULATION <br />ANSI AMERICAN NATIONAL STANDARDS INSTITUTE <br />AWG AMERICAN WIRE GAUGE <br />BDF BUILDING DISTRIBUTION FRAME <br />BEF BUILDING ENTRANCE FACILITY <br />BICSI BUILDING INDUSTRY CONSULTING SERVICES <br />BTU BRITISH THERMAL UNIT <br />C CONDUIT <br />CATV CABLE TELEVISION <br />CB CIRCUIT BREAKER <br />CCTV CLOSED CIRCUIT TELEVISION <br />CER COMPUTER EQUIPMENT ROOM <br />CKT CIRCUIT <br />CL CENTER LINE <br />CLG CEILING <br />COND CONDUCTOR <br />CPU CENTRAL PROCESSING UNIT <br />CU COPPER <br />D/A DIGITAL TO ANALOG CONVERSION <br />DB DECIBEL <br />DC DIRECT CURRENT <br />DGP DATA GATHERING PANEL <br />DVR DIGITAL VIDEO RECORDER <br />DWG DRAWING(S) <br />EBC EQUIPMENT BONDING CONDUCTOR <br />EC ELECTRICAL CONTRACTOR <br />EIA ELECTRONICS INDUSTRY ASSOCIATION <br />ELEC ELECTRICAL <br />EM EMERGENCY <br />EMI ELECTROMAGNETIC INTERFACE <br />EMR ELEVATOR MACHINE ROOM <br />EMT ELECTRICAL METALLIC TUBING <br />EOLR END-OF-LINE RESISTOR <br />FA FIRE ALARM <br />FCC FEDERAL COMMUNICATIONS COMMISSION <br />FO FIBER OPTIC <br />FREQ FREQUENCY <br />FTP FOIL TWISTED PAIR <br />G GROUND <br />GHz GIGAHERTZ <br />GND GROUND <br />HH HANDHOLE <br />Hz HERTZ <br />IDF INTERMEDIATE DISTRIBUTION FRAME <br />IDS INTRUSION DETECTION SYSTEM <br />IDP INTRUSION DETECTION PANEL <br />IEEE INTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS <br />I/O INPUT/ OUTPUT <br />JB JUNCTION BOX <br />KHz KILOHERTZ <br />LAN LOCAL AREA NETWORK <br />LED LIGHT EMITTING DIODE <br />LV LOW VOLTAGE <br />MAX MAXIMUM <br />MDF MAIN DISTRIBUTION FRAME <br />MER MECHANICAL EQUIPMENT ROOM <br />MIN MINIMUM <br />MISC MISCELLANEOUS <br />MTD MOUNTED <br />MUX MULTIPLEXER <br />N NEUTRAL <br />NC NORMALLY CLOSED <br />NEC NATIONAL ELECTRIC CODE <br />NESC NATIONAL ELECTRIC SAFETY CODE <br />NIC NOT IN CONTRACT <br />NO NORMALLY OPEN <br />No NUMBER <br />NRTL NATIONALLY RECOGNIZED TESTING LABORATORY <br />NTS NOT TO SCALE <br />NVR NETWORK VIDEO RECORDER <br />OC ON CENTER <br />OD OUTSIDE DIAMETER <br />OPD OVERCURRENT PROTECTION DEVICE <br />OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION <br />OSP OUTSIDE PLANT <br />PA PUBLIC ADDRESS <br />PB PULL BOX <br />PBX PRIVATE BRANCH EXCHANGE <br />PIR PASSIVE INFRA-RED <br />POTS PLAIN OLD TELEPHONE SERVICE <br />PP PATCH PANEL <br />PS POWER SUPPLY <br />PSIM PHYSICAL SECURITY INFORMATION MANAGEMENT <br />PTZ PAN-TILZ-ZOOM <br />PVC POLYVINYL CHLORIDE <br />RX REQUEST TO EXIT <br />SC SECURITY CONTRACTOR <br />SI SYSTEM INTERNATIONAL <br />SL SLEEVE <br />SMS SECURITY MANAGEMENT SYSTEM <br />SP SERVICE PROVIDER <br />SPD SURGE PROTECTION DEVICE <br />SPG SINGLE-POINT GROUND <br />STP SHIELDED TWISTED PAIR <br />SW SWITCH-POE (LOCAL AREA NETWORK) <br />SYS SYSTEM <br />TC TELECOMMUNICATIONS CONTRACTOR <br />TEL TELEPHONE <br />TELCO TELEPHONE COMPANY <br />TGB TELECOMMUNICATIONS GROUNDING BUSBAR <br />TIA TELECOMMUNICATIONS INDUSTRY ASSOCIATION <br />TMGB TELECOMMUNICATIONS MAIN GROUNDING BUSBAR <br />TO TELECOMMUNICATIONS OUTLET <br />TR TELECOMMUNICATIONS ROOM <br />TVSS TRANSIENT VOLTAGE SURGE SUPPRESSOR <br />TYP TYPICAL <br />UG UNDERGROUND <br />UL UNDERWRITERS LABORATORIES <br />UPS UNINTERRUPTIBLE POWER SUPPLY <br />UTP UNSHIELDED TWISTED PAIR <br />VMS VIDEO MANAGEMENT SYSTEM <br />WF WALL FIELD <br />WS WORKSTATION <br />INTRUSION DETECTION SYSTEM SYMBOLS <br />KP <br />MS <br />DB <br />ICP <br />WR <br />KEYPAD <br />MOTION SENSOR <br />DURESS BUTTON <br />WIRELESS RECIEVER <br />INTRUSION CONTROL PANEL -SHOWN FOR <br />COORDINATION ONLY <br />DEVICES PROVIDED BY DIVISION 08. <br />SHOWN FOR REFERENCE ONLY <br />CCTV SYSTEMS LEGEND <br />FIXED, VARI-FOCAL DOME CCTV CAMERA <br />PANORAMIC, 180° DOME CCTV CAMERA <br />PANORAMIC, 360° DOME CCTV CAMERA <br />VI VIDEO INTERCOM MASTER STATION <br />D <br />D <br />M <br />NVR NETWORK VIDEO RECORDER <br />CEILING MOUNTED CAMERAS <br />#SEQUENTIAL CAMERA NUMBER. TYP. <br />FIXED, VARI-FOCAL DOME CCTV CAMERA <br />PANORAMIC, 180° DOME CCTV CAMERA <br />PANORAMIC, 360° DOME CCTV CAMERA <br />WALL/POLE MOUNTED CAMERAS <br />#SEQUENTIAL CAMERA NUMBER. TYP. <br />ELECTRONIC SAFETY AND SECURITY GENERAL NOTES <br />1423 <br />A <br />C <br />B <br />1423 <br />A <br />C <br />SHEET NUMBER <br />TITLE <br />Approved <br />Checked <br />Drawn <br />Job Number <br />ISSUE CHART <br />CONSULTANTS <br />KEYPLAN <br />PROJECT <br />B <br />FIRM CERTIFICATION C.A #6057 <br />ERIK S WALKER P.E: #63929 <br />JOHN MOUDLER P.E: #33200 <br />CARLOS E. JIMENEZ P.E: #47923 <br />RICARDO DURAN P.E: #64768 <br />GLEN R. SEILER P.E: #83347 <br />BR+A CONSULTING ENGINEERS <br />2600 DOUGLAS ROAD, SUITE 1100 <br />CORAL GABLES, FL 33134 <br />THORNTON TOMASETTI <br />101 NE THIRD AVENUE, SUITE 1170 <br />FORT LAUDERDALE, FL 3330` <br />f.954.903.9300 <br />f 954.903 9301 <br />ESI CONSULTING ENGINEERS, INC <br />1315 NW 98TH CT. <br />UNIT 15, DORAL, FL 33172 <br />t. 305.418.9177 <br />t 305.418.9178 <br />HVAC <br />STRUCTURAL ENGINEERS <br />ELECTRICAL + PLUMBING <br />INMAN FOODSERICE GROUP <br />1330 CORAL WAY <br />SUITE 310 <br />MIAMI, FL 33145 <br />FOOD SERVICE <br />PE <br />R <br />M <br />I <br />T <br /> <br />S <br />E <br />T <br /> <br />1 <br />2 <br />. <br />0 <br />6 <br />. <br />1 <br />8 <br />1 2 /4 /2 0 1 8 8 :0 7 :3 7 A M <br />C :\_R e v i t \T E C H - G A T E W A Y - v 2 0 1 8 _a v i l l a n u e v a C B Y X V .r v t <br />SE00-01 <br />SECURITY LEGEND <br />JJP <br />AMV <br />810495.000 <br />JJP <br />SIB -GATEWAY <br />PARK <br />Copyright © 2018 Perkins+Will <br />PROJECT ADDRESS: <br />151 Sunny Isles Blvd <br />Sunny Isles Beach, FL <br />33160 <br />2800 Ponce De Leon Blvd <br />Suite 1300 <br />Coral Gables, FL 33134 <br />t 305.569.1333 <br />f 305.569.1334 <br />www.perkinswill.com <br />48 TERMINALS, CONNECTORS, DEVICES, CIRCUITS, CABLES, AND CABLE TERMINATIONS SHALL BE CLEARLY, <br />LOGICALLY, AND PERMANENTLY MARKED DURING INSTALLATION. ALL EQUIPMENT AND CONDUITS SHALL BE <br />IDENTIFIED. <br />49 ALL WIRING AND ELECTRICAL CIRCUITS SHALL BE NUMERICALLY IDENTIFIED AT BOTH ENDS AS REQUIRED BY <br />THE CONTRACT DOCUMENTS. EACH SYSTEM CONDUIT JUNCTION BOX, PULL BOX, OR ELECTRICAL ENCLOSURE <br />(FROM TERMINATION TO TERMINATION) CONTAINING SYSTEM CONDUCTORS, INCLUDING INITIATING DEVICE, <br />NOTIFICATION APPLIANCE, AND AUXILIARY FUNCTION CIRCUITS. <br />50 AC POWER CONDUCTORS OR GROUNDING CONDUCTORS SHALL BE UNIQUELY AND PERMANENTLY LABELED <br />WITH A NUMBERED TAG, LABEL OR STENCIL. LABEL SYSTEM PROPOSED BY THE CONTRACTOR SHALL BE <br />TYPEWRITTEN AND APPROVED BY OWNER OR THEIR AUTHORIZED REPRESENTATIVE. <br />51 ENCLOSURES, CABINETS, HOUSINGS, CONSOLES, POWER SUPPLY ENCLOSURES, CONTROL AND TERMINAL <br />CABINETS, CONTROL UNITS, WIRING GUTTERS AND OTHER COMPONENT HOUSINGS, BOXES AND FITTINGS OR <br />EVERY PRODUCT DESCRIPTION, COLLECTIVELY REFERRED TO AS ENCLOSURES, SHALL BE SO FORMED AND <br />ASSEMBLED AS TO BE STURDY AND RIGID. <br />52 ENCLOSURES, CABINETS, HOUSINGS, BOXES AND FITTINGS OR EVERY PRODUCT DESCRIPTION HAVING HINGED <br />DOORS OR REMOVABLE COVERS AND WHICH CONTAIN CIRCUITS, OR THE INTEGRATED SECURITY SYSTEMS <br />AND IT'S POWER SUPPLIES SHALL BE PROVIDED WITH COVER OPERATED, CORROSION-RESISTANT TAMPER <br />SWITCHES. ALL EQUIPMENT SHALL BE PROPERLY ATTACHED AND HELD FIRMLY IN PLACE. FASTENINGS AND <br />SUPPORTS SHALL BE ADEQUATE TO SUPPORT LOADS WITH MINIMUM SAFETY FACTOR OF THREE (3). ALL <br />MEANS OF EQUIPMENT AND CONDUIT SUPPORT SHALL BE APPROVED. <br />53 ALL WIRING SHALL BE RUN PERPENDICULAR OR PARALLEL TO THE FLOOR PLANE, WITH ALL BENDS MADE AT <br />NEAT RIGHT ANGLES. <br />54 ALL WIRING WITHIN THE CABINET SHALL BE PERMANENTLY ATTACHED USING SPIRAL WRAP TUBING AND NYLON <br />WIRE TIES WITH MECHANICAL (I.E.: SCREWS, RIVETS) FASTENERS. THE USE OF SELF-ADHESIVE FASTENERS <br />INSIDE THE CABINET(S) IS SPECIFICALLY PROHIBITED. <br />55 ALL ENCLOSURE PENETRATIONS SHALL BE FROM THE BOTTOM UNLESS THE SYSTEM DESIGN REQUIRES <br />PENETRATIONS FROM OTHER DIRECTIONS. PENETRATIONS OF INTERIOR ENCLOSURES INVOLVING <br />TRANSITIONS OF CONDUIT FROM INTERIOR TO EXTERIOR, AND ALL PENETRATIONS ON EXTERIOR ENCLOSURES <br />SHALL BE SEALED WITH RUBBER SILICONE SEALANT TO PRECLUDE THE ENTRY OF WATER. THE TERMINATOR <br />SHALL BE FILLED WITH AN APPROVED SEALANT AS RECOMMENDED BY THE CABLE MANUFACTURER AND IN <br />SUCH A MANNER THAT THE CABLE IS NOT DAMAGED. <br />56 ALL WIRING WITHIN THE CABINET SHALL BE NEATLY ROUTED IN HORIZONTAL AND VERTICAL CHANNELS <br />PARALLEL TO THE CABINET'S SIDES AND THE INTERIOR TERMINAL STRIPS. WIRING SHALL NOT BE ROUTED <br />OVER CIRCUIT BOARDS, TRANSFORMERS, OR TERMINAL STRIPS. AS GENERAL PRACTICE, RUN ALL POWER <br />CABLES, CONTROL CABLES, AND HIGH-LEVEL CABLES ON ONE SIDE OF AN EQUIPMENT CABINET. RUN ALL <br />OTHER CABLES ON THE OPPOSITE SIDE OF AN EQUIPMENT CABINET. THE CONTRACTOR SHALL MAINTAIN A <br />MINIMUM OF A TWELVE (12) INCH DISTANCE BETWEEN ALL PARALLEL RUNS OF AC ELECTRICAL POWER AND <br />LOW VOLTAGE CONDUIT OR LOW VOLTAGE WIRING. <br />57 NO CONDUIT SHALL BE LESS THAN 3/4" IN DIAMETER UNLESS DESIGNATED BY THESE SPECIFICATIONS AND/OR <br />PLANS. A PULL STRING SHALL BE INCLUDED IN EACH INDIVIDUAL CONDUIT RUN. <br />58 PROVIDE TESTING AND VERIFY THAT ALL SYSTEM CABLING AND FIELD WIRING IS FREE OF SHORTS, GROUNDS, <br />OPENS, HIGH RESISTANCE, AND OTHER FAULTS PRIOR TO TERMINATION TO DEVICES AND EQUIPMENT. THE <br />CONTRACTOR SHALL PROVIDE A DETAILED REPORT OF THE TEST TO OWNER'S SECURITY AND ITS <br />AUTHORIZED REPRESENTATIVE. <br />59 ALL CONDUITS SHALL BE IN INSTALLED IN ACCORDANCE WITH NFPA 70, THE NATIONAL ELECTRICAL CODE <br />(NEC), AMERICAN DISABILITY ACT (ADA) AND THE CONTRACT DOCUMENTS. <br />60 ALL CONDUIT ROUTES SHALL BE SO DESIGNED TO ENSURE THAT ALL LOW VOLTAGE WIRE AND CONDUIT <br />MAINTAIN THE REQUIRED MINIMUM OF TWELVE-INCH (12") DISTANCE SEPARATION FROM ANY OPEN <br />CONDUCTORS OF POWER, OR CLASS 1 CIRCUIT AND SHALL NOT BE PLACED IN ANY CONDUIT, JUNCTION BOX <br />OR RACEWAY CONTAINING THESE CONDUCTORS, AS PER NFPA 70, THE NATIONAL ELECTRICAL CODE (NEC). <br />61 THE ELECTRICAL CONTRACTOR SHALL AVOID CONDUIT RUNS PARALLEL TO ALL AC ELECTRICAL POWER. ANY <br />LOW VOLTAGE CONDUIT OR LOW VOLTAGE WIRING THAT CROSSES OVER AC ELECTRICAL POWER SHALL BE AT <br />A 90-DEGREE ANGLE. <br />62 ALL CONDUITS, RACEWAYS, AND OTHER ASSOCIATED ITEMS RELATED TO THE SYSTEM INSTALLED, SHALL NOT <br />OBSTRUCT ANY PORTION OF A WINDOW, DOORWAY, STAIRWELL, OR PASSAGEWAY AND SHALL NOT INTERFERE <br />WITH THE OPERATION OF ANY EXISTING MECHANICAL OR ELECTRICAL EQUIPMENT. <br />63 ALL BACK BOXES PROVIDED FOR RECESSED CEILING INSTALLATION SHALL INCLUDE ADEQUATE ACCESS AND <br />SHALL BE RATED FOR USE IN CEILINGS AND SHALL MEET OR EXCEED ALL APPLICABLE NATIONAL AND LOCAL <br />ELECTRICAL CODES. <br />64 ALL JUNCTION BOXES DEFINED BY THE RECORD SPECIFICATION MAY BE CONCEALED BUT MUST REMAIN <br />ACCESSIBLE FOR SERVICE AND TESTING. SECURITY JUNCTIONS BOXES MAY BE RECESSED INTO WALL OR <br />CEILING. <br />65 ALL JUNCTION BOXES AND SMALL DEVICE ENCLOSURES BELOW THE CEILING AND EASILY ACCESSIBLE TO <br />EMPLOYEES OR THE PUBLIC SHALL BE TAMPER PROOF, MONITORED, AND COVERED WITH SUITABLE COVER <br />PLATE. ALL JUNCTION BOXES ABOVE CEILING LEVEL IN OCCUPIED AREAS OF THE BUILDING SHALL NOT BE <br />CONSIDERED TO BE EASILY ACCESSIBLE. ALL LOCATIONS CONTAINING SECURITY SYSTEM COMPONENTS <br />UNDER THESE CONDITIONS SHALL INCORPORATE SECURE TAMPERPROOF SCREWS OR SIMILAR APPROVED <br />DEVICES. <br />66 ALL SYSTEM CABLING PROVIDED, AS PART OF THIS SYSTEM SHALL BE INSTALLED IN DEDICATED CONDUIT <br />RACEWAYS, WHICH ARE NOT USED FOR ANY OTHER PURPOSE, FUNCTION, OR SYSTEM. <br />67 CONDUIT SHALL BE CONCEALED IN ALL FINISHED AREAS. EXPOSED CONDUIT IS PERMITTED IN ELECTRICAL, <br />MECHANICAL AND UNFINISHED AREAS ONLY AS DETERMINED BY THE ARCHITECT PRIOR TO INSTALLATION. <br />68 ANY RUN OF EXPOSED CONDUIT SHALL BE PARALLEL OR AT A RIGHT ANGLE TO THE BUILDING LINES. <br />69 THE SECURITY CONTRACTOR SHALL COORDINATE WITH ELECTRICAL CONTRACTOR TO PROVIDE CONSTANT <br />120VAC TO ALL SECURITY EQUIPMENT ROOMS. <br />70 ALL DEVICES GENERATING RADIO FREQUENCIES SHALL BE CERTIFIED TO COMPLY WITH THE REQUIREMENTS <br />OF FCC PART 15 AND LABELED AS SET FORTH IN FCC PART 15. <br />71 CONTRACTOR SHALL TAKE ALL OTHER PRECAUTIONS IN ACCORDANCE WITH MANUFACTURER'S <br />RECOMMENDATIONS TO PREVENT ELECTROMAGNETIC INTERFERENCE WITH DATA TRANSMISSIONS. <br />72 NON-SECURITY SYSTEM WIRING SHALL NOT SHARE SECURITY CONDUIT. <br />73 THE SECURITY SYSTEM NETWORK SHALL COMMUNICATE WITH THE SYSTEM CONTROL WORKSTATIONS <br />THROUGH INDUSTRY STANDARD NETWORK SWITCHES AND ROUTERS AND SHALL NOT BE REQUIRED TO <br />RESIDE ON THE SAME SUBNET, AS THE INFORMATION TECHNOLOGY NETWORK. <br />74 THE SECURITY CONTRACTOR SHALL COORDINATE WITH THE CONTRACTOR OF DIVISION 08 700-DOOR <br />HARDWARE. <br />75 ALL ELECTRIFIED DOORS SHALL BE OPERATIONAL FROM THE INSIDE WITHOUT USE OF A KEY OR ANY SPECIAL <br />KNOWLEDGE OR EFFORT PER NFPA 101. <br />76 THE SECURITY CONTRACTOR SHALL COORDINATE WITH THE DOOR HARDWARE CONTRACTOR AS TO <br />INTERCONNECTION OF ALL INPUT TRIGGERS FOR RELEASE OF ELECTRICAL LOCKING HARDWARE AND <br />CONTACT OUTPUTS REQUIRED TO MONITOR DOOR RELATED ALARM POINTS. <br />77 ALL CAMERA CABLING SHALL BE CONCEALED AND PROTECTED IN A RIGID ENCASEMENT, CONDUIT, ARMORED <br />FLEX, OR SIMILAR APPROVED PASSAGES. CAMERA PLACEMENTS IN THE FIELD ARE FORBIDDEN TO HAVE <br />UNPROTECTED AND EXPOSED CONNECTORS, POWER CABLE, AND VIDEO FEEDS. INTEGRATED ARMATURES <br />THAT PASS THE CABLING FROM THE CAMERA TO THE WALL / JUNCTION BOX WITHOUT EXPOSING THE CABLING <br />AT ANY POINT SHALL BE DEEMED ACCEPTABLE. <br />78 PROVIDE BACK BOX AND ASSOCIATED CONDUIT, LOCKNUTS, COUPLINGS, THREADED BUSHINGS, AND PULL <br />ROPE FOR ALL DEVICES AS INDICATED ON DRAWINGS AND AS SPECIFIED. <br />79 THE FINAL FIELD PLACEMENT AND FIELD OF VIEW FOR EACH CAMERA LOCATION SHALL BE DETERMINED BY ON <br />SITE CONDITIONS. PRIOR TO THE PURCHASE OF ANY (CCTV) HARDWARE THE CONTRACTOR SHALL OBTAIN <br />WRITTEN ACCEPTANCE OF PROPOSED PLACEMENTS AND ASSOCIATED FOCAL LENGTHS FROM THE OWNER OR <br />ITS AUTHORIZED REPRESENTATIVE. <br />80 ALL PENETRATIONS THROUGH FIRE RATED BUILDING STRUCTURES, WALLS, AND FLOORS SHALL BE SEALED <br />WITH AN APPROPRIATE FIRE STOP SYSTEM. THIS REQUIREMENT APPLIES TO THROUGH PENETRATIONS <br />(COMPLETE PENETRATION) AND MEMBRANE PENETRATIONS (THROUGH ONE SIDE OF A HOLLOW FIRE RATED <br />STRUCTURE). ANY PENETRATING ITEMS I.E., RISER SLOTS AND SLEEVES, CABLES, CONDUIT, CABLE TRAY, AND <br />RACEWAYS, ETC. SHALL BE PROPERLY FIRE STOPPED. THE CONTRACTOR SHALL ENSURE THAT ANY FIRE STOP <br />SYSTEMS SHALL BE UL CLASSIFIED TO ASTM E8 14 (UL 1479). <br />81 THE CONTRACTOR SHALL ENSURE THAT ALL FIRE STOP SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH <br />THE MANUFACTURER'S RECOMMENDATIONS AND SHALL BE COMPLETELY INSTALLED AND AVAILABLE FOR <br />INSPECTION BY THE LOCAL INSPECTION AUTHORITIES PRIOR TO CABLE SYSTEM ACCEPTANCE. <br />82 UPON SUCCESSFUL COMPLETION OF THE INSTALLATION, THE CONTRACTOR SHALL CONDUCT FULL SYSTEM <br />TESTING TO ASSURE THAT THE SYSTEMS ARE CORRECTLY INSTALLED AND FULLY OPERATIONAL. CONFIRM IN <br />WRITING TO THE ARCHITECT THAT ALL ASPECTS OF THE SYSTEM HAVE BEEN TESTED BY THE CONTRACTOR <br />AND FOUND TO BE FULLY OPERATIONAL AND READY FOR FINAL ACCEPTANCE TESTING. <br />83 AT THE CONCLUSION OF TESTING PROVIDE (2) COPIES OF ALL TEST REPORT DOCUMENTATION OF THE TESTS <br />THAT SHALL REFLECT THE DATE, TIME, AND SYSTEM TESTING RESULTS. ADJUST, BALANCE AND TUNE ALL <br />EQUIPMENT AS REQUIRED FOR OPTIMUM QUALITY TO MEET MANUFACTURER'S PUBLISHED PERFORMANCE <br />SPECIFICATIONS AND OWNERS REQUIREMENTS. <br />1 THE SECURITY MANAGEMENT SYSTEM (SMS) SHALL INTEGRATE THE DIGITAL VIDEO SURVEILLANCE SYSTEM <br />(DVS), CLIENT WORKSTATIONS, FIELD DATA GATHERING PANELS (FIELD PANELS), CARD READERS, AND EACH <br />SUPPORT DEVICE AS INDICATED HEREIN AND SPECIFIED IN THE CONTRACT SPECIFICATIONS. <br />2 ALL WIRING AND CABLE BETWEEN DEVICES SHALL BE IN ACCORDANCE WITH THE OPERATING REQUIREMENTS <br />OF THE SMS SYSTEM AND SHALL SUPPORT COMMUNICATIONS FOR POINT IDENTIFICATION AND ACCESS <br />CONTROL TRANSACTIONS TO/FROM EACH DEVICE. <br />3 THE CONTROL WIRING BETWEEN FIELD DEVICES, REMOTE ACCESS CONTROL EQUIPMENT AND FIELD <br />PANELS/DATA GATHERING PANELS SHALL BE A MINIMUM OF No. 18 AWG AND SHALL BE COLOR-CODED. <br />4 PROVIDE WIRING FROM THE SMS FIELD PANEL TO THE INSTALLED FIRE ALARM SYSTEM SUCH THAT IN THE <br />EVENT OF A FIRE ALARM OR WHEN THE FIRE ALARM SYSTEM IS ACTIVATED, ALL DOORS FITTED WITH <br />ELECTROMAGNETIC LOCKS SHALL REVERT TO FAIL SAFE MODE OF OPERATION IN ACCORDANCE WITH THE <br />LOCAL AUTHORITY HAVING JURISDICTION AND OWNER OR THEIR AUTHORIZED REPRESENTATIVE. <br />5 ALL NON STAIRWELL DOORS FITTED WITH ELECTRIC MORTISE LOCKS SHALL REVERT TO A FAIL SECURE MODE <br />OF OPERATION IN ACCORDANCE WITH THE LOCAL AUTHORITY HAVING JURISDICTION AND OWNER'S SECURITY. <br />6 ALL STAIRWELL DOORS FITTED WITH ELECTRIC MORTISE LOCKS SHALL REVERT TO A FAIL SAFE MODE OF <br />OPERATION. <br />7 PROVIDE A HARD WIRED CONNECTION TO A 120 VAC, 20AMP NON-EMERGENCY CIRCUIT THAT IS DEDICATED TO <br />SECURITY FOR EACH SECURITY EQUIPMENT POWER SUPPLY LOCATION AS INDICATED ON THE DRAWINGS. THE <br />CIRCUIT CONNECTION SHALL BE PROVIDED WITHIN A BACK BOX, SURFACE MOUNTED AT 18" A.F.F. UNLESS <br />OTHERWISE NOTED. TERMINATE WIRE ENDS WITH INSULATED WIRE NUTS. <br />8 PROVIDE A HARD WIRED CONNECTION TO A 120 VAC, 20AMP EMERGENCY CIRCUIT THAT IS DEDICATED TO <br />SECURITY FOR EACH SECURITY EQUIPMENT POWER SUPPLY LOCATION AS INDICATED ON THE DRAWINGS. THE <br />CIRCUIT CONNECTION SHALL BE PROVIDED WITHIN A BACK BOX, SURFACE MOUNTED AT 18" A.F.F. UNLESS <br />OTHERWISE NOTED. TERMINATE WIRE ENDS WITH INSULATED WIRE NUTS. <br />9 PROVIDE AN UNSWITCHED DUPLEX OUTLET CONNECTED TO A 120 VAC, 20AMP EMERGENCY CIRCUIT <br />DEDICATED TO SECURITY IN THE SECURITY CONTROL CENTER AND EQUIPMENT ROOMS AS INDICATED ON THE <br />DRAWINGS. THE DUPLEX OUTLET SHALL BE FLUSH MOUNTED WITHIN THE FLOOR BELOW THE CONSOLE <br />AND/OR EQUIPMENT RACKS. EXACT LOCATION SHALL BE AS DIRECTED BY THE ARCHITECT. <br />10 PROVIDE A HARD WIRED CONNECTION TO A 120 VAC, 20 AMP NON-EMERGENCY CIRCUIT DEDICATED TO <br />SECURITY FOR DOORS UTILIZING EXIT DEVICES AS INDICATED ON THE DRAWINGS. THE CIRCUIT CONNECTION <br />SHALL BE PROVIDED WITHIN A BACK BOX, MOUNTED ABOVE THE CEILING, WITHIN AN ACCESSIBLE LOCATION <br />ADJACENT TO THE DOOR. TERMINATE WIRE ENDS WITH INSULATED WIRE NUTS. <br />11 PROVIDE AN UNSWITCHED DUPLEX OUTLET CONNECTED TO A 120 VAC, 20AMP NON-EMERGENCY CIRCUIT <br />DEDICATED TO SECURITY FOR EACH SECURITY CONVENIENCE DEVICE AS INDICATED ON THE DRAWINGS. THE <br />OUTLET SHALL BE FLUSH MOUNTED TO THE WALL AT 18" A.F.F UNLESS OTHERWISE NOTED. <br />12 REVIEW ALL CONTRACT DRAWINGS AND SURVEY EXISTING SITE CONDITIONS PRIOR TO ORDERING EQUIPMENT <br />OR PROCEEDING WITH WORK. <br />13 DRAWINGS SHALL BE USED BY THE CONTRACTOR AS A REFERENCE FOR THE REQUIREMENT AND LOCATION OF <br />THE SYSTEM COMPONENTS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ACQUAINT <br />THEMSELVES WITH ALL OF THE CONTRACT DRAWINGS, AND CONFIRM THE REQUIRED QUANTITIES OF DEVICES <br />AND SPECIFIC OPTIONS ON LOCATION. <br />14 PERFORM ALL WORK, PROVIDE PRODUCTS, SYSTEM INTEGRATION, COORDINATION, ENGINEERING, AND <br />DESIGN WORK REQUIRED FOR THE PROJECT IN ORDER TO ENSURE THE PROPER INSTALLATION OF THE <br />COMPLETE AND FULLY OPERATIONAL SYSTEMS PURSUANT TO THE CONTRACT DOCUMENTS. <br />15 ALL SYSTEMS PROVIDED SHALL BE IN ACCORDANCE WITH THE MOST CURRENT REVISION OF THE FEDERAL, <br />STATE, AND LOCAL CODES AND STANDARDS. THE AUTHORITY HAVING JURISDICTION SHALL PROVIDE FINAL <br />CLARIFICATION OF CODE REQUIREMENTS. CONFLICT OF ANY CODE REQUIREMENT WILL REQUIRE THE <br />ADAPTATION OF THE MORE STRINGENT REQUIREMENT FOR THE APPLICATION UNLESS A VARIANCE IS <br />AUTHORIZED BY THE LOCAL AUTHORITY HAVING JURISDICTION. <br />16 PROVIDE ALL COMPONENTS, INTERCONNECTION CONDUIT, CABLE/WIRE, APPURTENANCES, AND MATERIALS AS <br />REQUIRE TO FORM A COMPLETE COORDINATED SYSTEM READY FOR OPERATION. <br />17 PROVIDE ALL PLAN CHECKS, PERMITS, AND LICENSES NECESSARY FOR THE EXECUTION OF WORK AS <br />APPLICABLE FOR THE PROJECT. ALL FEES, CHANGES, AND OTHER ASSOCIATED COSTS INCURRED BY THE <br />FOREGOING SHALL BE BORNE BY THE CONTRACTOR. <br />18 THE CONTRACTOR SHALL PROVIDE A QUALIFIED AND COMPETENT FACTORY TRAINED AND STATE LICENSED <br />FIELD SUPERVISOR ON-SITE TO ENSURE THE PROPER INSTALLATION OF ALL SYSTEMS SPECIFIED AND IN <br />ACCORDANCE WITH THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION <br />ACTIVITIES WITH OTHER CONTRACTORS, TRADES, AND OWNER OR THEIR AUTHORIZED REPRESENTATIVE. <br />19 THE CONTRACTOR SHALL PROVIDE FACTORY TRAINED AND STATE LICENSED TECHNICIANS FOR THE <br />INSTALLATION AND SHALL PROVIDE PROOF OF SUCH SYSTEMS AUTHORIZED TRAINING. <br />20 PROVIDE ALL WIRING FROM EQUIPMENT HARDWARE MANUFACTURER'S TERMINAL STRIPS TO FINAL <br />CONNECTION POINTS OF EQUIPMENT. <br />21 THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING CONDITIONS AND ANY <br />CRITICAL DIMENSIONS ASSOCIATED WITH THE SCOPE OF WORK PRIOR TO SUBMITTING THE CONSTRUCTION <br />BID. THE CONTRACTOR SHALL CONFIRM THAT ALL WORK OUTLINED WITHIN THE CONTRACT DOCUMENTS CAN <br />BE ACCOMPLISHED AS SHOWN, AND SHALL NOTIFY IN WRITING AN AUTHORIZED REPRESENTATIVE OF ANY <br />CONDITIONS ENCOUNTERED WHICH MAY AFFECT BUILDING CODE COMPLIANCE. <br />22 VERIFY PARTITION LOCATIONS, AND AVOID CONFLICTS WITH LIGHTS, DIFFUSERS, GRILLS, AND OTHER LIKE <br />OBSTRUCTIONS. LOCATIONS OF ALL VISIBLE DEVICES AND EQUIPMENT SHALL BE COORDINATED WITH THE <br />ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO INITIATION OF WORK. <br />23 COORDINATE A FINAL SECURITY SYSTEM EQUIPMENT LAYOUT AND ROUTING OF THE CONDUIT WITH THE <br />CONTRACT DOCUMENTS. ANY CONFLICTS DISCOVERED SHALL IMMEDIATELY BE BROUGHT TO THE ATTENTION <br />OF THE OWNER FOR REVIEW AND APPROVAL PRIOR TO INITIATION OF WORK. <br />24 EQUIPMENT AND COMPONENTS SHOWN ON THESE PLANS ARE DIAGRAMMATIC IN NATURE AND ARE NOT TO BE <br />SCALED FOR EXACT DEVICE LOCATIONS. CONTRACTOR SHALL LOCATE DEVICES BASED ON APPLICABLE CODE, <br />KEY NOTES, AND AS DESIGNED BY THE ARCHITECT. <br />25 INSTALL ALL MATERIALS AND EQUIPMENT IN STRICT ACCORDANCE WITH THE MANUFACTURER'S DIRECTION, <br />TESTING AND OPERATIONAL PROCEDURES. <br />26 ALL MATERIALS, DEVICES, AND EQUIPMENT SHALL BE UNUSED, OF CURRENT MANUFACTURER, AND MEET OR <br />EXCEED THE LATEST PUBLISHED SPECIFICATIONS OF THE MANUFACTURER. DEVICES AND EQUIPMENT SHALL <br />BE THE LATEST MODEL OF THE MANUFACTURER UNLESS OTHERWISE INDICATED, OR UNLESS SUCH MODEL <br />FAILS TO MEET THE REQUIREMENTS OF THE CONTRACT DOCUMENTS. <br />27 ALL ELECTRONICS COMPONENTS SHALL BE STANDARD, UNMODIFIED PRODUCTION MODELS EXCEPT AS NOTED <br />WITH THE LATEST FIRMWARE/BIOS OFFERED BY THE MANUFACTURER AT THE TIME OF THE FINAL TEST. <br />28 PROTECT ALL EXISTING WORK, AND THE WORK OF OTHER ASSOCIATED TRADES FROM DAMAGE. ALL <br />EQUIPMENT PROVIDED SHALL BE KEPT INTERNALLY CLEAN AND PROTECTED AGAINST BLOWING DUST, WIND, <br />STORMS, SUN, FLOOD, RAIN, SNOW, HEAT, RAIN, MOISTURE, AND ANY OTHER DAMAGING FACTORS. ALL <br />INSTALLATION WORK SHALL BE COVERED AND PROTECTED AGAINST DAMAGE. <br />29 EQUIPMENT AND MATERIALS SHALL BE PROPERLY STORED, ADEQUATELY PROTECTED AND CAREFULLY <br />HANDLED TO PREVENT DAMAGE BEFORE AND DURING INSTALLATION. <br />30 EQUIPMENT STORED ON THE PREMISES IS AT THE CONTRACTORS OWN RISK. THE OWNER IS NOT THE <br />CARETAKER OF UNINSTALLED OR STAGING OF HARDWARE ON-SITE UNLESS PREVIOUSLY AUTHORIZED IN <br />WRITING BY OWNER OR ITS AUTHORIZED REPRESENTATIVE TO ACCEPT CUSTODIANSHIP OF THE HARDWARE. <br />31 ELECTRICAL CONTRACTOR SHALL PROVIDE PRIMARY, DEDICATED ELECTRICAL POWER (120/220 VAC). <br />32 ELECTRICAL CONTRACTOR SHALL SUPPLY AND PROVIDE DEDICATED 20 AMP, 120 VAC POWER AT SECURITY <br />LOCATIONS FOR CONNECTION BY THE SECURITY CONTRACTOR. ALL PRIMARY CONTROL PANELS SHALL BE <br />CONNECTED TO GENERATOR BACKUP CIRCUITS. <br />33 ALL PRIMARY CONTROL PANELS, COMMUNICATION TRANSPORTATION DEVICES, POWER SUPPLIES NETWORK <br />VIDEO RECORDERS, AND DIGITAL VIDEO RECORDERS SHALL BE CONNECTED TO UPS BACKUP CIRCUITS, <br />BATTERY BACKUP, OR GENERATOR POWER BACKUP SYSTEM. <br />34 PROVIDE ALL THE INTERCONNECTIONS BETWEEN POWERED JUNCTION BOXES AND THE SECURITY EQUIPMENT. <br />35 ADHERE TO ALL SYSTEM AND COMPONENT GROUNDING REQUIREMENTS AS SPECIFIED BY THE EQUIPMENT <br />MANUFACTURERS. <br />36 PROVIDE SURGE SUPPRESSION, GROUNDING AND BONDING THAT WILL EFFECTIVELY PROTECT, WITHIN <br />TESTED LIMITS, THE SYSTEMS HARDWARE AND EQUIPMENT AGAINST LIGHTNING TRANSIENTS, INTERNAL AND <br />EXTERNAL SWITCHING TRANSIENTS, AND OTHER SURGE TRANSIENTS THROUGHOUT THE USEFUL LIFE OF THE <br />SYSTEM. <br />37 ALL WIRING SHALL BE PROPERLY SUPPORTED AND INSTALLED IN CONDUIT AND CABLE TRAY, ON CENTER AS <br />REQUIRED IN CONTRACT DOCUMENTS. <br />38 ALL CONDUIT FILL SHALL NOT EXCEED 40 PERCENT OF INTERIOR CROSS SECTIONAL AREA WHERE THREE OR <br />MORE CABLES ARE CONTAINED WITHIN A SINGLE CONDUIT. <br />39 CABLES, RACEWAYS, AND CONDUIT SHALL NOT BE SUPPORTED FROM DUCTWORK, PIPING, PLUMBING <br />SYSTEMS, CEILING TILE AND LIGHTING FIXTURE SUSPENSION WIRES OR BUILDING STRUCTURE. <br />40 CABLES SHALL BE ROUTED IN CONDUIT OR OTHER SUITABLE RACEWAY SUBJECT TO ACCEPTANCE BY THE <br />ARCHITECT. <br />41 AT LOCATIONS WHERE CABLES PASS THROUGH METAL STUDS OR DOOR FRAMES, THE CONTRACTOR SHALL <br />INSTALL A BUSHING OR GROMMET TO PREVENT DAMAGE TO THE CABLES. <br />42 ALL CABLES MUST BE FREE OF TENSION AT BOTH ENDS AND OVER THE ENTIRE LENGTH OF THE RUN. <br />43 CABLE TIES AND SUPPORTS SHALL NOT PINCH, BIND, CRIMP, OR IN ANY WAY CAUSE PHYSICAL OR ELECTRICAL <br />CHARACTERISTIC DAMAGE TO THE CABLING. THE CONTRACTOR SHALL ASSURE THAT DURING AND UPON <br />COMPLETION OF THE INSTALLATION, ALL CABLES ARE FREE OF KINKS, SHARP BENDS, TWISTS, GOUGES, CUTS <br />OR ANY OTHER PHYSICAL DAMAGE. <br />44 ALL CABLING SHALL BE PLENUM RATED IN ACCORDANCE WITH THE NEC. <br />45 PLENUM RATED CABLE TIES AND CABLE SUPPORTS SHALL BE UTILIZED IN ALL PLENUM RATED SPACES. <br />46 ALL CABLE RUNS SHALL BE CONTINUOUS BETWEEN DEVICES WITHOUT SPLICES. CONNECTIONS SHALL BE <br />MADE USING TERMINAL BLOCKS. WIRES CONNECTED TOGETHER SHALL HAVE THE SAME COLOR INSULATION. <br />ALL CONNECTIONS SHALL BE ACCESSIBLE FOR INSPECTION AND SERVICES AND SHALL BE CLEARLY IDENTIFIED <br />ON THE CONTRACTOR'S AS-BUILT DRAWINGS. ALL DEVICE BACK BOXES, JUNCTION BOXES AND PULL BOXES <br />SHALL BE LABELED AND ACCESSIBLE FOR INSPECTION AND MAINTENANCE. <br />47 WIRING COLOR CODE SHALL BE MAINTAINED THROUGHOUT THE INSTALLATION AS REQUIRED BY THE <br />SPECIFICATIONS. <br />NO.ISSUE DATE <br />PERMIT SET 12.06.2018