My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-01-09_GATEWAY PARK CENTER_CONFORMED DRAWINGS FOR BID
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
2019-01-09_GATEWAY PARK CENTER_CONFORMED DRAWINGS FOR BID
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 11:43:53 AM
Creation date
1/31/2019 11:23:07 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPEAKER WIRING BY AV VENDOR <br />AV <br />EQUIPMENT <br />RACK <br />PATHWAY <br />AV SPEAKER (TYPICAL) -REFER TO PLANS <br />FOR LOCATIONS -COORDINATE WITH ARCHITECURAL RCP. SEE <br />SPEC FOR ADDITIONAL INFORMATION. <br />J-HOOK <br />AV40-03 <br />3 <br />CEILING SYSTEM - <br />REFER TO <br />ARCHITECTURAL RCP <br />TILE BRIDGE <br />INTERLOCKING <br />SPEAKER CAN TO TILE <br />BRIDGE <br />PROVIDE SUPPORT <br />SECURED TO <br />STRUCTURE ABOVE <br />CEILING SPEAKER -SEE PLANS FOR <br />LOCATIONS AND SPEC FOR ADDITIONAL <br />INFORMATION <br />CEILING SPEAKER <br />(1) 1" CONDUIT TO NEXT <br />SPEAKER <br />NOTE: <br />1. SPEAKER WIRE TO BE <br />SUPPLIED AND INSTALLED BY <br />AV VENDOR. CONDUIT, <br />WORKBOXES AND FLEX <br />CONDUIT PROVIDED BY <br />ELECTRICAL CONTRACTOR. <br />2. SPEAKER SUPPLIED AND <br />INSTALLED BY AV VENDOR. <br />3. PROVIDE C TRIM RING AND TILE <br />BRIDGE AS REQUIRED FOR <br />PROPER INSTALLATION. <br />1/2" FLEX CONDUIT. <br />PROVIDE SUFFICIENT <br />AMOUNT OF FLEX <br />CONDUIT FOR FULL <br />REMOVAL OF SPEAKER. <br />2 GANG DEEP <br />JUNCTION BOX WITH <br />COVER <br />AV <br />EQUIPMENT <br />RACK <br />PATHWAY <br />AV SPEAKER (TYPICAL) -REFER TO PLANS <br />FOR LOCATIONS -COORDINATE WITH <br />ARCHITECURAL RCP. SEE SPEC FOR <br />ADDITIONAL INFORMATION. <br />AV40-04 <br />1 <br />(1) 1" CONDUIT <br />(1) 1/2" FLEX <br />CONDUIT <br />1423 <br />A <br />C <br />B <br />1423 <br />A <br />C <br />SHEET NUMBER <br />TITLE <br />Approved <br />Checked <br />Drawn <br />Job Number <br />ISSUE CHART <br />CONSULTANTS <br />KEYPLAN <br />PROJECT <br />B <br />FIRM CERTIFICATION C.A #6057 <br />ERIK S WALKER P.E: #63929 <br />JOHN MOUDLER P.E: #33200 <br />CARLOS E. JIMENEZ P.E: #47923 <br />RICARDO DURAN P.E: #64768 <br />GLEN R. SEILER P.E: #83347 <br />BR+A CONSULTING ENGINEERS <br />2600 DOUGLAS ROAD, SUITE 1100 <br />CORAL GABLES, FL 33134 <br />THORNTON TOMASETTI <br />101 NE THIRD AVENUE, SUITE 1170 <br />FORT LAUDERDALE, FL 3330` <br />f.954.903.9300 <br />f 954.903 9301 <br />ESI CONSULTING ENGINEERS, INC <br />1315 NW 98TH CT. <br />UNIT 15, DORAL, FL 33172 <br />t. 305.418.9177 <br />t 305.418.9178 <br />HVAC <br />STRUCTURAL ENGINEERS <br />ELECTRICAL + PLUMBING <br />INMAN FOODSERICE GROUP <br />1330 CORAL WAY <br />SUITE 310 <br />MIAMI, FL 33145 <br />FOOD SERVICE <br />PE <br />R <br />M <br />I <br />T <br /> <br />S <br />E <br />T <br /> <br />1 <br />2 <br />. <br />0 <br />6 <br />. <br />1 <br />8 <br />1 2 /4 /2 0 1 8 8 :0 7 :3 4 A M <br />C :\_R e v i t \T E C H - G A T E W A Y - v 2 0 1 8 _a v i l l a n u e v a C B Y X V .r v t <br />AV40-04 <br />AV DETAILS <br />JJP <br />AMV <br />810495.000 <br />JJP <br />SIB -GATEWAY <br />PARK <br />Copyright © 2018 Perkins+Will <br />PROJECT ADDRESS: <br />151 Sunny Isles Blvd <br />Sunny Isles Beach, FL <br />33160 <br />N.T.S.3 AV SPEAKER DIAGRAM (ACCESSIBLE CEILING) <br />2800 Ponce De Leon Blvd <br />Suite 1300 <br />Coral Gables, FL 33134 <br />t 305.569.1333 <br />f 305.569.1334 <br />www.perkinswill.com <br />N.T.S.1 AV SPEAKER CEILING MOUNT DETAIL WITH FLEX CONDUIT <br />N.T.S.2 AV SPEAKER DIAGRAM (INACCESSIBLE CEILING) <br />NO.ISSUE DATE <br />PERMIT SET 12.06.2018
The URL can be used to link to this page
Your browser does not support the video tag.