My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-01-09_GATEWAY PARK CENTER_CONFORMED DRAWINGS FOR BID
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
2019-01-09_GATEWAY PARK CENTER_CONFORMED DRAWINGS FOR BID
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 11:43:53 AM
Creation date
1/31/2019 11:23:07 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />4 <br />2 <br />3 <br />ACB <br />1 <br />4 <br />2 <br />3 <br />AC SHEET NUMBERTITLEApprovedCheckedDrawnJob NumberISSUE CHARTCONSULTANTSKEYPLANPROJECTB PERMIT SET 12.06.18FIRM CERTIFICATION C.A #6057 JOHN MOUDLER P.E: #33200 CARLOS E. JIMENEZ P.E: #47923 JOHN J. PETERS RCDD: #193108RBR+A CONSULTING ENGINEERS 2600 DOUGLAS ROAD, SUITE 1100 CORAL GABLES, FL 33134 THORNTON TOMASETTI 101 NE THIRD AVENUE, SUITE 1170 FORT LAUDERDALE, FL 3330`f.954.903.9300 f 954.903 9301 ESI CONSULTING ENGINEERS, INC 1315 NW 98TH CT, UNIT 15 DORAL, FL 33172 t.305.418.9177 f 305.418.9178HVACSTRUCTURAL ENGINEERSELECTRICAL + PLUMBING INMAN FOODSERICE GROUP 1330 CORAL WAY SUITE 310 MIAMI, FL 33145FOOD SERVICEFIRM CERTIFICATION C.A. #26243 IGOR F. GONZALEZ P.E. #56098 <br />1 <br />/ <br />1 <br />1 <br />/ <br />2 <br />0 <br />1 <br />9 <br /> <br />5 <br />: <br />5 <br />3 <br />: <br />1 <br />1 <br /> <br />P <br />M <br />C <br />: <br />\ <br />U <br />s <br />e <br />r <br />s <br />\ <br />j <br />o <br />s <br />e <br />j <br />\ <br />D <br />o <br />c <br />u <br />m <br />e <br />n <br />t <br />s <br />\ <br />C <br />0 <br />2 <br />0 <br />3 <br />2 <br />1 <br />1 <br />8 <br />- <br />M <br />E <br />C <br />H <br />_ <br />R <br />1 <br />8 <br />_ <br />k <br />a <br />r <br />i <br />n <br />c <br />@ <br />e <br />s <br />i <br />c <br />o <br />n <br />s <br />u <br />l <br />t <br />. <br />c <br />o <br />m <br />. <br />r <br />v <br />t <br />M10 -03MECHANICAL LEVEL 04 PARTIAL FLOOR PLAN -NEW WORKCheckerAuthor810495.000 ApproverSIB -GATEWAY PARK PROJECT ADDRESS:151 Sunny Isles Blvd Sunny Isles Beach, FL 331602800 Ponce De Leon Blvd,Suite 1300,Coral Gables, FL 3313 t 305.569.1333 f 305.569.1334 www.perkinswill.com MARK ISSUE DATEPERMIT SET 12.06.20181 <br /> <br />R <br />e <br />v <br />i <br />s <br />i <br />o <br />n <br /> <br />1 <br />01.09.2019 1SHEET NO LONGER IN USE
The URL can be used to link to this page
Your browser does not support the video tag.