My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-01-09_GATEWAY PARK CENTER_CONFORMED DRAWINGS FOR BID
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
2019-01-09_GATEWAY PARK CENTER_CONFORMED DRAWINGS FOR BID
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 11:43:53 AM
Creation date
1/31/2019 11:23:07 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F G H I J K L M <br />2 <br />2.2 <br />3 <br />4 <br />REMOVE ALL DISCONNECTS FOR EXISTING HVAC EQUIPMENT, <br />PULL CONDUCTORS BACK TO SOURCE, MARK BREAKER SPARE. <br />DISCONNECT ALL LOADS FROM PANEL. PANEL SHALL BE REPLACED BY NEW AND BE RELABELED AS PER RISER DIAGRAM. <br />TWO 4" CONDUITS ENTER PANEL FROM BELOW <br />TWO 4" CONDUITS ENTER PANEL FROM BELOW <br />EXISTING PNL R2EXISTING PNL R1 <br />EXISTING 4" CONDUITS FROM MAIN IT ROOM <br />RISE FROM UNDERGROUND HERE <br />EXISTING 4" CONDUITS FROM MAIN IT ROOM <br />RISE FROM UNDERGROUND HERE <br />DISCONNECT ALL LOADS FROM PANEL. PANEL SHALL BE REPLACED BY NEW AND BE RELABELED AS PER RISER DIAGRAM. <br />GENERAL DEMOLITION NOTES: <br />1. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO REMOVE EXISTING EQUIPMENT AS REQUIRED TO ACCOMPLISH THE NEW WORK AS SHOWN OR REASONABLY IMPLIED. THE CONTRACTOR SHALL REFER TO THE NEW ARCHITECTURAL, PLUMBING, FIRE PROTECTION, MECHANICAL AND ELECTRICAL WORK SHOWN ON THE <br />OTHER DRAWINGS OF THIS SET TO DETERMINE THE EXTENT OF DEMOLITION REQUIRED. <br />2. WHEN REMOVING ELECTRICAL EQUIPMENT AND SYSTEMS, ALL PRECAUTIONS SHALL BE TAKEN TO PREVENT STRUCTURAL DAMAGE TO THE BUILDING. THE CONTRACTOR SHALL COORDINATE INSTALLATION OF ANY STRUCTURAL SUPPORTS REQUIRED, TEMPORARY OR PERMANENT <br />3. THE CONTRACTOR SHALL EXERCISE CARE SO THAT ONLY THAT CONSTRUCTION INDICATED OR REASONABLY IMPLIED TO BE REMOVED SHALL BE DEMOLISHED. THE EXISTING CONSTRUCTION TO REMAIN SHALL BE LEFT INTACT AND UNDAMAGED. THE CONTRACTOR SHALL PROTECT ALL FIRE ALARM DEVICES, EXIT SIGNS AND <br />OTHER DEVICES EXISTING TO REMAIN WHICH MAY BE AFFECTED BY CONSTRUCTION. <br />4. THE CONTRACTOR SHALL MAINTAIN CONTINUITY OF CIRCUITS WHERE EXISTING EQUIPMENT IS TO BE REMOVED AND DOWN STREAM DEVICES MAY BE EFFECTED. <br />5. THE CONTRACTOR SHALL COORDINATE ALL POWER INTERRUPTIONS WITH THE OWNER. SEE SPECIFICATIONS. <br />6. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS DURING DEMOLITION AND CONSTRUCTION TO MAINTAIN THE INTEGRITY AND OPERATION OF EXISTING LIFE SAFETY AND EMERGENCY EGRESS EQUIPMENT. <br />7. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS DURING DEMOLITION AND CONSTRUCTION TO MAINTAIN ACCESS TO ALL MEANS OF EGRESS CORRIDORS, DOORWAYS AND STAIRS. <br />8. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS DURING DEMOLITION AND CONSTRUCTION TO PERMIT EFFECTED AREAS TO CONTINUE TO FUNCTION TO THE GREATEST EXTENT POSSIBLE. THIS EFFORT SHALL INCLUDE SCHEDULED COORDINATION WITH THE OWNER OF ELECTRICAL SHUTDOWNS. <br />9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL FLUORESCENT AND HID LAMPS AND PROPER DISPOSAL OF SAID LAMPS AND SHALL PROVIDE VERIFICATION OF LAMP DISPOSAL TO THE OWNER UPON REQUEST. <br />10. CONTRACTOR SHALL SEAL ALL FIRE RATED PENETRATIONS WITH A FIRE SEALANT EQUAL TO THE RATINGS OF THE PENETRATION. <br />11. IF DISCREPANCIES ARE FOUND BETWEEN PLANS AND EXISTING CONDITIONS AT SITE, THE CONTRACTOR SHALL CONTACT ENGINEER PRIOR TO PERFORMING WORK. <br />12. ALL EXISTING BRANCH CIRCUITING TO BE DEMOLISHED REQUIRES THE REMOVAL OF CONDUIT AND WIRING BACK TO SOURCE PANEL. THE AFFECTED CIRCUIT BREAKERS SHALL BE TURNED OFF AND LABELLED AS SPARE. PROVIDE UPDATED TYPEWRITTEN PANELBOARD SCHEDULES REFLECTING REMAINING CIRCUITS AND <br />SPARE BREAKERS. <br />1423 <br />A <br />C <br />B <br />1423 <br />A <br />C <br />SHEET NUMBER <br />TITLE <br />Approved <br />Checked <br />Drawn <br />Job Number <br />ISSUE CHART <br />CONSULTANTS <br />KEYPLAN <br />PROJECT <br />B <br />FIRM CERTIFICATION C.A #6057 <br />JOHN MOULDER P.E: #33200 <br />CARLOS E. JIMENEZ P.E: #47923 <br />JOHN J. PETERS RCDD #193108R <br />BR+A CONSULTING ENGINEERS <br />2600 DOUGLAS ROAD, SUITE 1100 <br />CORAL GABLES, FL 33134 <br />t. 305.529.1515 <br />THORNTON TOMASETTI <br />101 NE THIRD AVENUE, SUITE 1170 <br />FORT LAUDERDALE, FL 3330` <br />f.954.903.9300 <br />f 954.903 9301 <br />ESI CONSULTING ENGINEERS, INC <br />1315 NW 98TH CT. <br />UNIT 15, DORAL, FL 33172 <br />t. 305.418.9177 t 305.418.9178 <br />HVAC <br />STRUCTURAL ENGINEERS <br />ELEC + PLUM + FPRO + TECH <br />INMAN FOODSERICE GROUP <br />1330 CORAL WAY <br />SUITE 310 <br />MIAMI, FL 33145 <br />FOOD SERVICE <br />PE <br />R <br />M <br />I <br />T <br /> <br />S <br />E <br />T <br /> <br />1 <br />2 <br />. <br />0 <br />6 <br />. <br />1 <br />8 <br />FIRM CERTIFICATION C.A #26243 <br />IGOR F. GONZALEZ P.E: #56098 <br />1 2 /1 1 /2 0 1 8 4 :1 8 :3 7 P M <br />C :\_R e v i t \E L E C - G A T E W A Y - v 2 0 1 8 _j p e r e z @ b r p l u s a .c o m .r v t <br />E04-01 <br />LEVEL 01 -ELECTRICAL <br />DEMO <br />Checker <br />Author <br />810495.000 <br />Approver <br />SIB -GATEWAY <br />PARK <br />Copyright © 2018 Perkins+Will <br />PROJECT ADDRESS: <br />151 Sunny Isles Blvd <br />Sunny Isles Beach, FL <br />33160 <br />2800 Ponce De Leon Blvd <br />Suite 1300 <br />Coral Gables, FL 33134 <br />t 305.569.1333 <br />f 305.569.1334 <br />www.perkinswill.com <br />1/8" = 1'-0"1 LEVEL 01 - Electrical Demo <br />NO.ISSUE DATE <br />PERMIT SET 12.06.2018
The URL can be used to link to this page
Your browser does not support the video tag.