My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Exhibit A - Building Dept Fee Schedule
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Exhibit A - Building Dept Fee Schedule
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 11:58:37 AM
Creation date
1/31/2019 11:57:48 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Building Department Fee Schedule <br />work described on the permit is partially completed, <br />an inspection shall be performed on those portions <br />of the work completed, provided that compliance <br />with the Florida Building Code may be determined <br />with respect to those portions. If an inspection is <br />required to assure compliance with the Florida <br />Building Code once the initial inspection and one (1) <br />follow-up inspection have been done, the permit <br />holder shall pay a fee for each additional inspection. <br />All such re-inspection fees shall be paid prior to any <br />re-inspection taking place and the final inspection <br />being conducted. Payment should be in person at <br />the City of Sunny Isles Beach Building Department. <br /> (fee is per trade) <br /> <br /> 3. LOST, REVISED AND REWORKED PLAN FEES <br /> <br />A-005 <br />(Res.) <br /> <br />A-006 <br />(Comm.) <br /> <br /> <br /> <br /> <br /> <br />A-005.a <br /> <br /> <br />A-006.a <br /> (a) LOST PLANS: When a field copy (job copy) is <br />lost, a recertification fee shall be paid to the Building <br />Department (before the office copy is sent out for <br />duplication). The recertification fee shall cover the <br />following services from the Building Department: <br />review and approval by all applicable trades, and <br />stamp indicating the Building Official’s certification. <br />Such fee shall be based on thirty percent (30%) of <br />the original building permit fee. <br /> <br />1a. Minimum Fee for Group I (Single Family <br />Residence) <br /> <br />1b. Minimum Fee for all others <br /> <br /> <br /> <br />30% <br /> <br /> <br /> <br /> <br /> <br /> <br />$50.00 <br /> <br /> <br />$100.00 <br /> <br /> <br /> <br />A-007 <br />(Res.) <br /> <br /> <br />A-007.a <br /> <br /> <br />A-007.b <br />(b) REVISED PLANS PROCESSING FEE: <br /> <br />1(b) Major plan revision after permit is issued <br />shall be subjected to a fee of fifty percent (50%) <br />of the original permit fee. <br /> <br />2(b) Minor plan revision shall be subject to a <br />minimum $50.00 fee and $65.00 per ½ hour or <br />fraction thereof for each submittal. <br /> <br />3(c) Minimum Fee for minor plan review <br /> <br /> <br /> <br />50 % <br /> <br /> <br /> <br />$50.00 <br /> <br /> <br />$50.00 <br /> <br />A-007.d (d) LOST PERMIT CARD FEE: A fee shall be $50.00
The URL can be used to link to this page
Your browser does not support the video tag.