My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5-2.3 QC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Responses
>
TGSV Enterprises
>
Tab 4 Approach
>
Approach
>
5-2.3 QC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2019 3:35:05 PM
Creation date
3/13/2019 3:35:03 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUALITY CONTROL CHECKLIST/REPORT <br />INSTALLATION OF METAL DOORS Page 1 of 2 <br />Project No.: Superintendent's Name: <br />10-10 <br />Project Name: Subcontractor: <br />TELEMUNDO Initials <br />Location <br />TGSV's SUB'S Date <br />Item Spec. Sections <br />No. Item <br />1 Required shop drawings & product data on-site approved <br />2 Doors are as approved-size, type design. <br />3 <br />4 Check doors for damage at delivery. <br />5 <br />6 Fabrication, construction & workmanship. <br />7 Smooth edges & joints, finish & straightness. <br />8 Additional reinforcement provided for hardware. <br />9 Observe backing plates during drilling operation. <br />10 Observe that closure channels are provided. <br />11 <br />12 Observe type of factory-installed hardware. <br />13 <br />14 <br />15 Fire-rated doors have labels & proper identification. <br />16 Wire glass is provided. <br />17 <br />18 Observed installation & verify proper clearance tolerances. <br />19 Doors are hung straight, level & plumb. <br />20 <br />21 <br />22 Observe glazing operation. <br />23 Factory prime is retouched. <br />24 Surfaces are adequate to receive applied finish. <br />25 Report doors that cannot be properly cleaned. <br />26 Silencers installed. <br />Hardware is properly adjusted. <br />Back set is matched to finish hardware. <br />Stile edges, astragals, required for pairs or doors. <br />Fusible-line holders provided, at louvers. <br />Door functions smoothly and easily. <br />Check panel, lights, louvers & features. <br />Proper storage & protection provided at job site. <br />Provisions to receive hardware are adequate.
The URL can be used to link to this page
Your browser does not support the video tag.