My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cost tracking
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Responses
>
TGSV Enterprises
>
Tab 9 Forms & Attachments
>
Cost tracking
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2019 3:38:40 PM
Creation date
3/13/2019 3:38:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />GATEWAY PARK CENTER <br />ITB # 19-01-01 <br />TGSV Enterprises, Inc. <br /> <br />Page 1 <br /> <br /> <br /> <br /> <br />COST TRACKING AND CONTROL <br /> <br />TGSV Enterprises, Inc. uses two resources for Cost Tracking and Control. The first is <br />our Timberline based accounting software. This program is used to enter all costs for a <br />project broken down for every cost line item associated with any given project. An initial <br />budget cost is entered for all costs that are identified for a project at its commencement. <br />This includes General Condition costs, material costs, Owner Direct Purchase Items (if <br />required), trade contractor costs, permits, insurance, etc. As these budgets become <br />commitments, either through contracts or actual costs, the budget updates to provide <br />you a snap shot of where the actual project. This is facilitated by our second resource, <br />which is our cost loaded schedule, which indicates to us where our cost should be as <br />relates as to the project schedule. Looking at both of these reports side by side will help <br />identify any cost line items or activities that are not in line with what was budgeted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.