My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Nunez Construction
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Responses
>
Nunez Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2019 11:14:17 AM
Creation date
3/14/2019 12:20:28 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L./ NUNEZ <br /> CONSTRUCTION <br /> 4110 <br /> 410 <br /> COMPLETED PROJECT <br /> tip <br /> 4110 NAME OF PROJECT: ESTEFAN KITCHEN AT THE DESIGN DISTRICT <br /> LOCATION OF PROJECT: MIAMI DESIGN DISTRICT <br /> 4100 <br /> OWNER'S NAME & CONTACT INFO: ESTEFAN ENTERPRISES, INC. <br /> RICARDO J. DOPICO, ESQ.—(305) 695-7013 <br /> tio RDOPICO@ESTEFAN.COM <br /> 410 ARCHITECT'S NAME & CONTACT INFO: V3 ARCHITECTURAL GROUP <br /> 410 JOSE A. VIDAL—(305) 559-1496 <br /> tip JOSE@V3ARCHITECTURALGROUP.COM <br /> 410 <br /> for PROJECT TYPE: COMMERCIAL- RESTAURANT <br /> r' PROJECT GROSS SQUARE FOOTAGE: 5,000 SQ FT <br /> CONTRACT COST: COST PLUS CONTRACT CONSTRUCTION DOCUMENTS <br /> 40 AT 30% <br /> fir <br /> tir ACTUAL FINAL COST: ESTIMATED AT$2,000,000.00 <br /> 410 CLAIMS: NONE <br /> 4110 <br /> fir SCHEDULED COMPLETION DATE: DECEMBER JANUARY 2017 <br /> tio ACTUAL COMPLETION DATE: JANUARY 2017 <br /> tir <br /> PROJECT MANAGER: EDSEL MARTINEZ <br /> 40+ LEED CERTIFIED: No <br /> fir <br /> 4110 <br /> GATEWAY PARK CENTER BID 19-01-01 <br /> 4 <br /> 4110 6400 S.W. 62nd Ave. 305 774 9000 <br /> 40 South Miami, FL 33143 nunezconstruction.co CGC057207 <br />
The URL can be used to link to this page
Your browser does not support the video tag.