My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Nunez Construction
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Responses
>
Nunez Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2019 11:14:17 AM
Creation date
3/14/2019 12:20:28 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
lire Appenalx t - tul I HOLM l:liy or bunny isles beacn-uaieway ram <br /> loy Cost Schedule <br /> ALL NUMBERS MUST BE TYPED <br /> ligy <br /> Code Description Quantity UoM Total <br /> mor► <br /> CITY OF SUNNY ISLES BEACH-GATEWAY PARK <br /> NW MAIN PROJECT <br /> 'lam' 1 BASE BID-CONSTRUCTION <br /> iii, 1A BUILDING CONSTRUCTION <br /> A10 SUBSTRUCTURE I i5F $ 3'LS,000.UU <br /> to, F $ 4,000.UU <br /> B20 EXTERIOR ENCLOSURE ( O <br /> 411100 C10 INTERIOR CONSTRUCTION l p,F $ 131 U,1UU.UU <br /> VIP C30 INTERIOR FINISHES ( OF $ 859,165.00 <br /> r D20 PLUMBING ( (5F $ 1 t3U,45U.UU <br /> D30 HVAC l ISF $ 004,/UU.UU <br /> illiv <br /> D40 FIRE PROTECTION I LSF $ /7,000.00 <br /> lir <br /> D50 ELECTRICAL ( 1SF $ 1,0 15,7, .1 <br /> 411. E10 EQUIPMENT&FURNISHINGS ( 1SF $ 64,5UU.UU <br /> Iv F20 SELECTIVE BUILDING DEMOLITION I lSF $ 1 /,ODU.UU <br /> lir 1B KITCHEN EQUIPMENT 1 -1.S $ 32,4UU.UU <br /> Total-Direct Cost $ 4,U41,215.UU <br /> illy <br /> Escalation and Prime mark up LS $ 11,494,3/1.UU <br /> r Total -Construction Cost 5,535,5S6.UU <br /> olly <br /> iblv 2 AUDIO VISUAL <br /> 2A AUDIO VISUAL INFRASTRUCTURE LS $1155,000.00 <br /> Imo <br /> 2B AUDIO VISUAL EQUIPMENT LS $ <br /> 411110, 3 LOOSE FURNITURE LS $(i2157 • <br /> ow Total -Construction Cost with AV and Furniture $6,455,28Ei.UU <br /> _, Total in words- Six Million Four Hundred Fifty Five Thousand Two Hundred Eighty Six Dollars <br /> ADDITIONAL COST ITEMS <br /> 4 KIOSK PLAN SF $ 77,300.00 <br /> lir <br /> 5 HALLWAY FINISH SF $ 3,500.00 <br /> 6 STORAGE ROOM SF $ill, 7 ENTRY MAT SF $ 3,800.00 <br /> 8 ADDITIONAL AV LS $ 5,000.00 <br /> 9 ADDITIONAL CCTV SYSTEM EA $ 5,000.00 <br /> i'iv 10 REPLACE EXISTING GLASS DOOR WITH STOREFRONT EA $ 1,600.00 <br /> 11 WASHER&DRYER ( lEA $ 500.00 <br /> illr 12 ROOF WORK LS $ 81,000.00 <br /> gbr 13 WINDOW FILM SF $ 1,500.00 <br /> 14 SECURITY TELESCOPING GLASS DOOR LS $ 14,000.00 <br /> NW <br /> 15 ADDITIONAL HVAC TO EXISTING IT ROOM LS $ 4,500.00 <br /> Total -Additional Cost ill" Total -Construction Cost with Additional Itemsl$5,803,886.00 <br /> lilt Company Name: Nunez Construction, Inc. <br /> r Name of Authorized si r: Carlo . ung <br /> Title: President ,3 <br /> ` "" Written Signature: °'r -----6 <br /> 46. Date: March 13, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.