My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Nunez Construction
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Responses
>
Nunez Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2019 11:14:17 AM
Creation date
3/14/2019 12:20:28 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4., <br /> NUNEZ <br /> CONSTRUCTION-60 <br /> MARCH 12, 2019 <br /> tar <br /> CITY OF SUNNY ISLES BEACH <br /> CITY CLERK <br /> 18070 COLLINS AVENUE <br /> 4111, SUNNY ISLES BEACH, FL. 33160 <br /> RE:CITY OF SUNNY ISLES BEACH, BID NO.GATEWAY PARK CENTER 19-01-01 <br /> 1111, DEAR SIR OR MADAME, <br /> 411, NUNEZ CONSTRUCTION, INC. IS PLEASED TO SUBMIT OUR BID IN RESPONSE TO THE SUNNY ISLES RFP FOR THE <br /> GATEWAY PARK CENTER 19-01-01.As CONSTRUCTION MANAGERS AND STATE CERTIFIED GENERAL CONTRACTORS, <br /> 411, WE ARE CONFIDENT IN OUR ABILITY TO PERFORM ALL THE REQUIREMENTS DESCRIBED IN THE RFP AND THE <br /> 41.0 CONSTRUCTION DOCUMENTS TO YOUR COMPLETE SATISFACTION. <br /> OUR IN-DEPTH EXPERIENCE WITH COMPLETING BOTH,THE 14,000 SF AMERICAN AIRLINES ADMIRALS CLUB LOUNGE <br /> AND THE 5,000 SF AMERICAN EXPRESS CENTURION LOUNGE EXPANSION AND REMODELING (BOTH DESIGNED BY <br /> r PERKINS AND WILL) PLACES US IN A UNIQUE POSITION AND A DEFINITE CONTRIBUTING ASSET TO COMPLETE THIS <br /> PROJECT. ASIDE FROM HAVING WORKED WITH THE SAME ARCHITECT THAT FACILITATES COMMUNICATION AND <br /> METHODOLOGIES,THERE ARE SIMILARITIES IN THE SCOPE OF WORK WHEN COMPARED WITH GATEWAY PARK CENTER. <br /> 411, THESE SPACES INCLUDE SIMILAR STRUCTURAL COMPONENTS, INTERIOR FINISHES (RESTROOMS, SOUND ATTENUATING <br /> SLIDING DOORS,AND MECHO SHADE)AND LOOSE FURNITURE.WE BELIEVE EARLY PROCUREMENT OF FINISH ITEMS AND <br /> A TEAM KNOWLEDGEABLE ON HOW TO EXECUTE THEIR RESPECTIVE WORK IS THE CORNERSTONE FOR THE SUCCESS OF <br /> 411119 THE PROJECT. OUR SIZE ALLOWS FOR QUICK DECISIONS AND FAST TURNAROUND. FURTHERMORE, OUR SUCCESSFUL <br /> 4/0 LONG-TERM RELATIONSHIP WITH OUR SUBCONTRACTOR BASE WILL BE INVALUABLE AND CENTRAL TO THE PROJECT'S <br /> 4111, TIMELY AND QUALITY DELIVERY. <br /> THE PROJECT, APPROXIMATELY 17,039 SQ. FT., CONSISTS OF A SLAB ON GRADE AND INTERIOR BUILD-OUT.THE SLAB <br /> 40 WILL CONSIST OF A THICKENED EDGE.THE INTERIORS WILL INCLUDE WALLS,CEILINGS,AND FLOORS WITH THE REQUIRED <br /> INFRASTRUCTURE FOR MEP AND LOOSE FURNITURE AND KITCHEN EQUIPMENT. <br /> 4110 <br /> AMONG ALL REQUIREMENTS DELINEATED IN THE RFP, INHERENT IN OUR BID IS THE ATTENTION AND RESOURCES <br /> tir <br /> NEEDED TO COMPLY WITH SAFETY(OSHA SAFETY STANDARDS)AND CLEANLINESS THROUGHOUT THE PROJECT. <br /> 411, <br /> GATEWAY PARK CENTER BID 19-01-01 <br /> 41110 6400 S.W. 62nd Ave. 305 774 9000 <br /> fity South Miami, FL 33143 nunezconstruction.co CGC057207 <br />
The URL can be used to link to this page
Your browser does not support the video tag.