My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Shiff Construction Bid Protest
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
Bid Protest
>
ITB 19-01-01 Gateway Park Center
>
Shiff Construction Bid Protest
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2019 9:28:44 AM
Creation date
5/14/2019 9:28:21 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Justen Shiff <br />From: Justen Shiff <br />Sent: Wednesday, March 20, 2019 11:59 AM <br />To: 'Genesis Cuevas' <br />Subject: RE: Invitation to Bid No. 19-01-01 Gateway Park Center <br />Good morning Genesis, yes, our bid of $5,622,818.75 is inclusive of all work including the project mark-up. When we <br />reviewed sheet 3, we weren't completely sure how it should be filled out. Page 1 which we signed shows the total bid <br />amount. As for the items listed with NIP, this was written because these items are not noted as "Additional" on the <br />plans and are included in the base. Please see below clarification for each item. Please let me know if this clarifies or <br />you should need anything additional. Thank you, Justen <br />Construction Costs on Page 1 Includes Markup. <br />Page 1,2 <br />#12 Roof Work NIP - All roof patching included in proposal. No other specific roofing work Indicated in Plans <br />#15 Additional HVAC to Existing IT Room — IT room FCU -2 / CU -2 included in Bid. Not Indicated as Additional in Plans <br />Page 5 <br />#8 Additional AV NIP - No additional AV Indicated in Plans. Bid reflects all AV listed in AV00-01 thru AV40-05 <br />#9 Additional CCTV NIP — No additional CCTV Indicated in Plans. Bid reflects all CCTV listed in SE10-01 thru SE40-01 <br />#12 Roof Work NIP - All roof patching included in proposal. No other specific roofing work Indicated in Plans <br />#15 Additional HVAC to Existing IT Room NIP - IT room FCU -2 / CU -2 included in Bid. Not Indicated as Additional in Plans <br />Page #12 <br />#8 Additional AV NIP - No additional AV Indicated in Plans. Bid reflects all AV listed in AV00-01 thru AV40-05 <br />#9 Additional CCTV NIP — No additional CCTV Indicated in Plans. Bid reflects all CCTV listed in SE10-01 thru SE40-01 <br />#12 Roof Work NIP - All roof patching included in proposal. No other specific roofing work Indicated in Plans <br />#15 Additional HVAC to Existing IT Room NIP - IT Room FCU -2 / CU -2 included in Bid. Not Indicated as Additional in Plans <br />PLEAS -E NOTE OUR MEW ADDRESS <br />Justen Shiff <br />Shiff Construction & Development, Inc. <br />CM@Risk I Design + Build I Owner's Rep <br />180 SW 6th Street <br />Pompano Beach FI 33062 <br />O 954.524.2575 1 F 954.524.2576 <br />www.shiff.com <br />ESH I F F, <br />CONSTRUCTION « DEVELOPMENT <br />Please consider the environment before printing this e-mail. <br />From: Genesis Cuevas <gcuevas@sibfl.net> <br />Sent: Wednesday, March 20, 2019 8:54 AM <br />To: Justen Shiff <jds@shiff.com> <br />
The URL can be used to link to this page
Your browser does not support the video tag.