My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Shiff's Exhibit 1 - 15
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
Bid Protest
>
ITB 19-01-01 Gateway Park Center
>
Shiff's Exhibit 1 - 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 3:33:26 PM
Creation date
5/16/2019 3:12:50 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Gateway Park Center
Bid No. (xx-xx-xx)
19-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix E - EDITABLE City of Sunny Isles Beach-Gateway Park <br /> Cost Schedule <br /> ALL NUMBERS MUST BE TYPED <br /> C)/... <br /> Code Description Quantity UoM Total <br /> CITY OF SUNNY ISLES BEACH-GATEWAY PARK • <br /> MAIN PROJECT <br /> 1 BASE BID-CONSTRUCTION <br /> 1A BUILDING CONSTRUCTION <br /> A10 SUBSTRUCTURE I 1 I ISF $ $ 270,944.40 i <br /> B20 EXTERIOR ENCLOSURE ( 1 I 1SF $1$ 3,135.00 <br /> C10 INTERIOR CONSTRUCTION I I pF $ ,$ 209,1 10.00 <br /> C30 INTERIOR FINISHES 1 , I /SF $ 2,248,900.13 <br /> D20 PLUMBING I 1s, F $($ 140,547.00 <br /> D30 HVAC I 1 I SF $($833,306.10 1 <br /> 040 FIRE PROTECTION .1 r kF $I$ 61,296.40 <br /> D50 ELECTRICAL [ 1 1 1sF $($713.698.25 1 <br /> E10 EQUIPMENT&FURNISHINGS L 1 1 1SF $1$ 330,259.62 <br /> F20 SELECTIVE BUILDING DEMOLITION I j L ISF $ $ 13,310.00 I <br /> 1B KITCHEN EQUIPMENT I 1 1 ILS $ $ 272,771.92 <br /> Total-Direct Cost $I <br /> Escalation and Prime mark up LS $ <br /> Total -Construction Cost$ 5,097,278.82 <br /> CD2 AUDIO VISUAL <br /> 2A AUDIO VISUAL INFRASTRUCTURE Inc w/bid ill ILS $ <br /> 2B AUDIO VISUAL EQUIPMENT 1 <br /> 1LS $L 525.539.93 1 <br /> 3 LOOSE FURNITURE 1 LS $r <br /> Total -Construction Cost with AV and Furniture$ 5,622,818.75 <br /> Total in words- Five Million Six Hundred Twenty Two thousand Eight hundred eighteen dollars ar <br /> ADDITIONAL COST ITEMS <br /> • 4 KIOSK PLAN pncw/Bid 1SF $ - <br /> 5 HALLWAY FINISH nc WI Bid ISF $ I <br /> 6 STORAGE ROOM pncw/BIS ISF $ <br /> 7 ENTRY MAT Lcwlaid ISF $ <br /> 8 ADDITIONAL AV Inc w/Bid ILS $ ( <br /> 9 ADDITIONAL CCTV SYSTEM Pc w/Bid KA $ 1_________1 <br /> 10 REPLACE EXISTING GLASS DOOR WITH STOREFRONT pmw/ad JEA $ I <br /> 11 WASHER&DRYER k w/Bid lEA $ ( <br /> 12 ROOF WORK 11-Hp ILS $ <br /> 13 WINDOW FILM pncw/Bb 1SF $ <br /> 14 SECURITY TELESCOPING GLASS DOOR nC WI Bid LS $ 1 I <br /> 15 ADDITIONAL HVAC TO EXISTING IT ROOM [MP ILS $ I <br /> Total-Additional Cost Items'sp I <br /> Total -Construction Cost with Additional Items 5,622,818.75 I <br /> • <br /> Company Name• i •.nstruction <br /> ' Name of Auth,,jiz�ed ne •- usten Shiff <br /> Y' 9 <br /> Title: Presiden <br /> Writte(i Signatu - <br /> Date: 3/13/19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.