My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Shiff's Exhibit 1 - 15
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
Bid Protest
>
ITB 19-01-01 Gateway Park Center
>
Shiff's Exhibit 1 - 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 3:33:26 PM
Creation date
5/16/2019 3:12:50 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Gateway Park Center
Bid No. (xx-xx-xx)
19-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHIFFI <br /> ocr,,..•DEVELOPMENT <br /> 2. Hurricane Preparedness <br /> a. Hurricane Tips <br /> • Hurricane season generally lasts from June 1st to November 30th. <br /> • The most dangerous hurricanes form off the coast of Africa and approach <br /> Florida from the East during the months of August and September. <br /> • Obtain a hurricane tracking and information guide at a local supermarket and <br /> take the precautions that it recommends. <br /> • According to experts, forecasters only have a 10%chance of accurately <br /> predicting where a storm will hit 72 hours in advance. They have a 74% <br /> chance within 24 hours. <br /> • In the event of an approaching hurricane all contractors and/or subcontractors, <br /> of any tier, must prepare the project for heavy rains and high winds and close <br /> the job sufficiently in advance so that they may make personal preparations at <br /> home. <br /> b. During the Hurricane Season <br /> • Develop a call-in team, including contractor's/subcontractor's safety <br /> personnel, in the event preparations need to be made. <br /> • All contractors/subcontractors, of any tier, shall keep the project free from an <br /> accumulation of debris and scrap material that can become windblown <br /> hazards. This will reduce the amount of time necessary to secure the project <br /> site in the event of a hurricane emergency. As part of standard operating <br /> procedures, ensure that standby diesel dewatering pumps,portable pumps, <br /> and generators are in operational condition at all times and that an adequate <br /> supply of pump and bail equipment, duct tape, banding strap,banding tools, <br /> fuel, oil and grease, and tarps to cover the dumpsters are on hand. <br /> c. Hurricane Warning Checklist <br /> • Secure all exterior building openings, doors and windows. Consider <br /> temporary bracing for large doors which are not designed for high wind <br /> loads. <br /> • Install protective measures to minimize the infiltration of water into the <br /> building and excavations (e.g., grading, berms, sandbags, pipe caps, etc.). <br /> If necessary,protect trailers to minimize the infiltration of water. <br /> • <br /> 1350 NE 56T"Street Suite 100 Fort Lauderdale,Florida 33334 I t:(954)524 2575 I f:(954)524 2576 <br />
The URL can be used to link to this page
Your browser does not support the video tag.