My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2014-2210
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2014
>
Reso 2014-2210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2015 11:16:51 AM
Creation date
4/3/2014 10:48:00 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2014-2210
Date (mm/dd/yyyy)
03/20/2014
Description
Agmt w/Lynx ConstructionMgmt to Construct Wall Under Lehman Cswy, Awd RFP 13-10-02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
change, including but not limited to, changes in activity duration, start and finish times, <br />and activity relationship. Use available total float, if any, before requesting an extension <br />of the Contract Time. <br />9.2 CONTRACTOR INITIATED MODIFICATIONS <br />If latent or unforeseen conditions require modifications in the contract, the Contractor may <br />propose changes by submitting a request for a change order to the City. Contractor shall use the <br />change order request form approved by the City for said modification requests. The following <br />MUST be submitted/included by Contractor: <br />• A statement outlining reasons for the change and the effect of the change on the Work. <br />Provide a complete description of the proposed change. Indicate the effect of the <br />proposed change on the Contract Amount and the Contract Time. <br />• A list of quantities of products required or eliminated and unit costs, with total amount of <br />purchases and credits to be made. If requested, furnish survey data to substantiate <br />quantities. <br />• Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade <br />discounts. <br />• Cost of labor and supervision directly attributable to the change. <br />• Comply with any applicable product requirements if the proposed change requires <br />substitution of one product or system for product or system specified. <br />9.3 ALLOWANCES <br />Allowance Adjustment. To adjust allowance amounts, Contractor shall base each Change <br />Order proposal on the difference between purchase amount and the allowance, multiplied by <br />final measurement of work -in- place. If applicable, Contractor shall also include reasonable <br />allowances for cutting losses, tolerances, mixing wastes, normal product imperfections, and <br />similar margins. Contractor also agrees to the following conditions: <br />• Include installation costs in purchase amount only where indicates as part of the <br />allowance. <br />• If requested, prepare explanation and documentation to substantiate distribution of <br />overhead costs and other margins claimed. <br />• Submit substantiation of a change in scope of work, if any, claimed in change orders <br />related to unit -cost allowances. <br />• The City reserves the right to establish the quantity of work -in -place by independent <br />quantity survey, measure, or count. <br />Contractor must submit claims for increased costs because of a change in scope or nature of the <br />allowance described in the contract documents, whether for the purchase order amount or <br />contractor's handling, labor, installation, overhead, and profit. Contractor shall submit claims <br />within fourteen (14) days of receipt of the change order or construction change directive <br />authorizing work to proceed. The City will reject claims submitted later than fourteen (14) days <br />after such authorization. Contractor also agrees to the following conditions: <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.