My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment D
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
Attachment D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:10:14 PM
Creation date
1/14/2020 3:10:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
25. Firms from Section C Involved with this Project. Indicate <br />which firms (or branch offices, if appropriate) on the project team <br />were involved in the example project, and their roles. List in the <br />same order as Section C. <br />Section G. Key Personnel Participation in Example Projects. <br />This matrix is intended to graphically depict which key <br />personnel identified in Section E worked on the example projects <br />listed in Section F. Complete the following blocks (see example <br />below). <br />26. and 27. Names of Key Personnel and Role in this <br />Contract. List the names of the key personnel and their <br />proposed roles in this contract in the same order as they appear <br />in Section E. <br />28. Example Projects Listed in Section F. In the column <br />under each project key number (see block 29) and for each key <br />person, place an "X" under the project key number for <br />participation in the same or similar role. <br />26. NAMES OF KEY <br />PERSONNEL <br />(From Section E, <br />Block 12) <br />29. Example Projects Key. List the key numbers and titles of <br />the example projects in the same order as they appear in Section <br />F. <br />Section H. Additional Information. <br />30. Use this section to provide additional information <br />specifically requested by the agency or to address selection <br />criteria that are not covered by the information provided in <br />Sections A -G. <br />Section I. Authorized Representative. <br />31. and 32. Signature of Authorized Representative and <br />Date. An authorized representative of a joint venture or the <br />prime contractor must sign and date the completed form. <br />Signing attests that the information provided is current and <br />factual, and that all firms on the proposed team agree to work on <br />the project. Joint ventures selected for negotiations must make <br />available a statement of participation by a principal of each <br />member of the joint venture. <br />33. Name and Title. Self-explanatory. <br />SAMPLE ENTRIES FOR SECTION G (MATRIX) <br />27. ROLE IN THIS <br />CONTRACT <br />(From Section E, <br />Block 13) <br />28. EXAMPLE PROJECTS LISTED IN SECTION F <br />(Fill in "Example Projects Key" section below first, before <br />completing table. Place 'V under project key number for <br />participation in same or similar role.) <br />1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 F 10 <br />Jane A. Smith Chief Architect X X <br />Joseph B. Williams Chief Mechanical Engineer X X X X <br />Tara C. Donovan Chief Electricial Engineer X X X <br />29. EXAMPLE PROJECTS KEY <br />JUMBER <br />TITLE OF EXAMPLE PROJECT (From Section F) <br />NUMBER <br />TITLE OF EXAMPLE PROJECT (From Section F) <br />1 <br />Federal Courthouse, Denver, CO <br />6 <br />XYZ Corporation Headquarters, Boston, MA <br />2 <br />Justin J. Wilson Federal Building, <br />Baton Rouge, LA <br />7 <br />Founder's Museum, Newport, RI <br />STANDARD FORM 330 (REV=177 <br />PAGE 3 OF INSTRUCTIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.