My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 2
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
Add No 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:10:23 PM
Creation date
1/14/2020 3:10:22 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDENDUM # 2 <br />DATE: December 13, 2019 <br />TO: ALL PROPOSERS <br />FROM: Purchasing Agent <br />TITLE: RFQ 19-11-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park <br />Elements across A1A at 174TH ST. CCNA <br />SUBJECT: Addendum No. 2 <br />BID SUBMITTAL DEADLINE: Friday, December 20, 2019 at 2:30 PM Monday, January 13, 2020 at 2:30 <br />PM <br /> <br />Please attach this addendum to the documents in your possession and include the Acknowledgement <br />of Addenda form with your response incorporated in the RFQ. This addendum is and does become a <br />part of the RFQ 19-11-01 Professional Engineering and Architectural Services for Pedestrian Bridge <br />with Park Elements Across A1A at 174TH ST. CCNA. <br /> <br />Questions & Answers: <br /> <br />Q1. NOTE on Page 11: The City of Sunny Isles, Contract Number and Title must be on each Certificate of <br />Insurance (COI). The City of Sunny Isles Beach must be shown as additional insured. Our insurance <br />company doesn’t typically issue COIs containing this specific information until contract negotiations. <br />Would the City accept a letter from our insurance company stating that our firm has the ability to comply <br />100% with your specific request or a sample insurance certificate at this time in lieu of the requirement <br />stated above? <br /> <br />If so, we would provide a COI that names the City as additional insured and includes The City of Sunny <br />Isles, Contract Number and Title during contract negotiations. <br />A1. Proof of insurance will suffice prior to contract award. <br /> <br />Q2. Page 19, 2nd paragraph: Firm shall be pre-qualified with FDOT in the following classes of work by <br />the by the time the agreement <br />is fully executed: <br />Work Group 3. Highway Design Roadway <br />Work Group 4. Highway Design – Bridges <br />Work Group 5. Bridge Inspection <br />Work Group 6. Traffic Engineering & Operations Studies <br />Work Group 7. Traffic Operations Design <br />Work Group 8. Surveying & Mapping <br />Work Group 9. Soil Exploration, Material Testing and Foundations <br />Work Group 14. Architect <br />Work Group 15. Landscape Architect <br /> <br />Does the prime “firm” have to be prequalified in ALL work groups themselves? <br />Or can the proposed “team” cover ALL of these work groups? <br />A2. The answer is no the prime firm does not need to be prequalified in all work groups themselves. <br />Sub-consultants can cover work groups however, based on the FHWA 1273 form, the prime contractor <br />shall perform with its own organization contract work amounting to not less than 30 percent (or a <br />greater percentage if specified elsewhere in the contract) of the total original contract price.
The URL can be used to link to this page
Your browser does not support the video tag.