My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FINLEY
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
Responses
>
FINLEY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:14:48 PM
Creation date
1/14/2020 3:12:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFQ No. 19-11-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. - CCNA. <br />City of Sunny Isles Beach <br />|93 <br />Calvin Giordano & Associates <br /> Florida Department of Transportation <br />RON DESANTIS <br />GOVERNOR 605 Suwannee Street <br />Tallahassee, FL 32399-0450 <br />KEVIN J. THIBAULT, P.E. <br />SECRETARY <br /> <br />www.fdot.gov <br />September 10, 2019 <br /> <br />Chris Giordano, Vice President <br />CALVIN, GIORDANO & ASSOCIATES, INC. <br />1800 Eller Drive, Suite 600 <br />Ft. Lauderdale, Florida 33316 <br /> <br />Dear Mr. Giordano: <br /> <br />The Florida Department of Transportation has reviewed your application for <br />prequalification package and determined that the data submitted is adequate to technically <br />prequalify your firm for the following types of work: <br /> <br />Group 3 - Highway Design - Roadway <br /> <br />3.1 - Minor Highway Design <br />3.2 - Major Highway Design <br /> <br />Group 6 - Traffic Engineering and Operations Studies <br /> <br />6.1 - Traffic Engineering Studies <br />6.2 - Traffic Signal Timing <br /> <br />Group 7 - Traffic Operations Design <br /> <br />7.1 - Signing, Pavement Marking and Channelization <br />7.2 - Lighting <br />7.3 - Signalization <br /> <br />Group 8 - Survey and Mapping <br /> <br />8.1 - Control Surveying <br />8.2 - Design, Right of Way & Construction Surveying <br />8.4 - Right of Way Mapping <br /> <br />Group 10 - Construction Engineering Inspection <br /> <br /> 10.1 - Roadway Construction Engineering Inspection <br /> 10.3 - Construction Materials Inspection <br /> 10.4 - Minor Bridge & Miscellaneous Structures CEI <br /> <br />Group 13 - Planning <br /> <br /> 13.4 - Systems Planning <br /> 13.5 - Subarea/Corridor Planning <br /> 13.6 - Land Planning/Engineering <br />QUALIFICATION INFORMATION & ASSIGNED PERSONNEL E
The URL can be used to link to this page
Your browser does not support the video tag.