My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2020-3042
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2020
>
Reso 2020-3042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2024 12:44:16 PM
Creation date
2/21/2020 3:16:24 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2020-3042
Date (mm/dd/yyyy)
02/20/2020
Description
Approve Agmt w/Tadeos Eng. – Design/Build Svcs - Pavilion Structure at Newport Pier
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach,Florida 33160 <br /> (305) 947-0606 phone(305)949-3113 Fax <br /> IF THE CONTRACTOR HAS QUESTIONS REGARDING THE <br /> APPLICATION OF CHAPTER 11. 9, FLORIDA STATUTES, TO THE <br /> CONTRACTOR'S DUTY TO PROVIDE PUBLIC RECORDS <br /> RELATING TO THIS CONTRACT, CONTACT THE CITY'S <br /> CUSTODIAN OF PUBLIC RECORDS AT '(305) 792-1703, ' <br /> CityClerk@sibfl.net, 18070 Collins Avenue, 4« Floor, Sunny Isles Beach, <br /> Florida 33160. <br /> 19. WARRANTY OF CONSTRUCTION <br /> 19.1 The Contractor shall warrant the labor performed for a minimum period of one (1) <br /> year from the date the Services are complete. This warranty shall be in addition to <br /> whatever rights the City may have under state or federal law. The Contractor's <br /> obligation under this warranty shall be at its own cost and expense, to <br /> promptly repair or replace (including cost of removal and installation), that <br /> item (or part or component thereof)which proves defective or fails to comply with <br /> the Agreement within the warranty period such that it complies with the <br /> Agreement. <br /> 19.2 Contractor warrants to the City that all materials and equipment furnished under <br /> this Agreement will be new.unless otherwise specified and will be of good <br /> quality, free from faults and,defects and in conformance with the Agreement. All <br /> equipment and materials not conforming to these requirements, including <br /> • <br /> substitutions not properly approved and authorized, may be considered defective. <br /> If required by City or its designee,Contractor shall furnish satisfactory evidence as <br /> to the kind and quality of materials and equipment. Manufacturer materials shall be <br /> warranted for a minimum period of ten (10) years from the date Services are <br /> complete. This warranty is not limited by any other provisions within this <br /> Agreement. <br /> 19.3 Contractor shall provide to the City or its designee all manufacturers' warranties. <br /> All warranties, expressed and/or implied, shall be given to the City for all material <br /> and equipment covered by.this Agreement. All material and equipment furnished <br /> shall be fully guaranteed by the Contractor against factory defects and <br /> workmanship. At no expense to the City, the Contractor shall correct any and all <br /> apparent and latent defects that are required under state or federal law. <br /> 20. PERFORMANCE AND PAYMENT BOND. The City requires the Contractor to furnish a <br /> _,Performance Bond:and:Pa ent..Bond_in.the amount.of-100%-of the total Compensation as set • <br /> - forth in Section 5 above, with,the City of Sunny Isles Beach as the Obligee, as security for the <br /> faithful performance-of the Agreement,and for the payment of all persons performing labor or <br /> furnishing materials" in connection herewith upon full execution of this Agreement. The <br /> 2020-7328 Tadeo Engineering,LLC <br /> 9 • <br />
The URL can be used to link to this page
Your browser does not support the video tag.