My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Maser Consulting, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Maser Consulting, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:05:37 AM
Creation date
8/21/2020 10:04:20 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFQ NO. 20-07-01 – CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) <br />SURVEYING AND MAPPING SERVICES / GEOTECHNICAL SERVICES <br /> <br /> <br /> <br />Maser Consulting <br />Client Reference: <br />Brunetti Organization (Owner) <br />Rich Brock, Vice President <br />2200 E. 4th Avenue, Hialeah, FL 33013 <br />Phone No.: 305.885.8000 x7447 <br />Email: RBrock@brunetti.com <br />Plaza Construction (General Contractor) <br />Ken Hahn <br />120 NE 27 Street, Suite 600, Miami, FL 33137 <br />Phone No.: 786.409.8019, <br />Email: khahn@plazaconstruction.com <br />Year Completed: <br />04/2013 – Current <br />Executed Agreements <br />Brunetti Organization (Owner) <br />Surveying and Mapping Services <br />Contract Amount: $82,000 <br />Plaza Construction (GC) <br />Surveying and Mapping Services <br />Contract Amount: $156,000 <br />Key Maser Team Member Participation: <br />John Liptak, PSM (PM and Surveyor of Record); Jose Morales, PSM (Construction Surveyor); Aimara <br />Diaz La Rosa, PSM (Design/Boundary Surveyor) <br /> <br /> <br />JADE SIGNATURE <br />Sunny Isles Beach, FL <br />Description of Work Performed: <br />Maser Consulting provided Suffolk construction full layout of piles, grid <br />control, settlement monitoring, grading, full as-built for close out <br />documents. <br />Client Reference: <br />Suffolk Construction <br />Victor Ponce, P.E., Assistant Project Manager <br />One Biscayne Tower, 2 South Biscayne Blvd, Suite 2700, Miami, FL <br />33131 <br />Phone No.: 305.459.4774 / Email: VPonce@suffolk.com <br />Year Completed: <br />09/2014 – 09/2018 <br />Executed Agreement <br />Suffolk Construction <br />Surveying and Mapping Services <br />$230,000 <br />Key Maser Team Member Participation: <br />John Liptak, PSM (PM and Surveyor of Record); Jeff Tuchband (Project <br />Manager); Aimara Diaz La Rosa, PSM (QA/QC) <br /> <br /> <br />Section F, Page 31
The URL can be used to link to this page
Your browser does not support the video tag.