My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Maser Consulting, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Maser Consulting, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:05:37 AM
Creation date
8/21/2020 10:04:20 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFQ NO. 20-07-01 – CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) <br />SURVEYING AND MAPPING SERVICES / GEOTECHNICAL SERVICES <br /> <br /> <br /> <br />Maser Consulting <br />Additional Similar Projects/Contracts <br /> <br />CITY OF MIAMI MISCELLANEOUS SURVEYING AND MAPPING SERVICES CONTRACT <br />City of Miami, Miami-Dade County, FL <br /> <br /> Description of Work Performed: <br />Under this miscellaneous surveying and mapping services <br />contract, Maser Consulting performed boundary and <br />topographic surveys for various city parks (Peacock Park, <br />Grove Mini-Park, North Bay Vista Park, Lummus Park, <br />Henry Reeves Park, West Buena Vista Park, Dorsey <br />Memorial Library, Silver Bluff Park, Simpson Park, <br />Morningside Park). <br />Surveys included elevations of tennis courts, basketball <br />courts, athletic field areas and pertinent site features such <br />as parking areas, buildings, trees, fences, sprinkler heads, <br />and light poles. Scope of services included: Locating the <br />project site in relation to property boundaries; All interior <br />improvements and improvements in the adjoining half <br />rights-of-way; Locating all Trees within the property <br />Boundaries; provide a tree table with tree name, trunk <br />diameter, height, and canopy; Locating all buildings within <br />the survey area; provide building corners, perimeter <br />dimensions, setback distances, top of parapet elevations, <br />and finished floor elevations; Taking elevation shots at 50- <br />foot intervals; additionally collect all visible terrain <br />deviation such as low and high points; Locating all courts <br />and show court lines, fences, etc.; Collecting invert <br />elevation, pipe size, and pipe type of all accessible existing <br />inlets and manholes; Locating all overhead <br />utility lines and poles within the survey area; <br />Showing existing easements; Setting two <br />onsite Benchmarks with state plane <br />coordinate and elevation, these points are to <br />be used as control points during <br />construction; Delivering 10 signed and <br />sealed copies of the resulting map of survey, <br />along with a CD containing digital version of <br />the resulting map of survey in PDF and DWG <br />formats; and Bathymetric Survey around <br />Dock & Boat Ramp. <br />Client Reference <br />Jose Otavio Caldeira <br />Project Manager, CIP <br />City of Miami <br />Riverside Center, 444 SW 2nd Avenue <br />Miami, FL 33132 <br />Phone No.: 305.416.1290 <br />Email: jcaldeira@miamigov.com <br />305.470.5194 <br />victorm.marrero@dot.state.fl.us <br /> <br />Year Completed: <br />2013 - Present <br /> <br />Key Maser Team Member <br />Participation: John Liptak, PSM (PM and <br />Surveyor of Record); Aimara Diaz La <br />Rosa; Michael Cardo, PSM (Project <br />Surveyor/Field Coordination); Jeffrey <br />Tuchband (QA/QC) <br /> <br />Executed Agreement: <br />City of Miami <br />Surveying & Mapping Services <br />Contract Amount to be determined per <br />Task <br />Section F, Page 34
The URL can be used to link to this page
Your browser does not support the video tag.