My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction Engineering & Inspection (CEI) Svcs
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Construction Engineering & Inspection (CEI) Svcs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:15:47 AM
Creation date
8/21/2020 10:14:24 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E-75Proven solutionsResponsive and dependable performance <br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA) <br />F. Example projects which best illustrate proposed team’s qualifications for this contract <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br /> NUMBER <br />21 <br />21. TITLE AND LOCATION (City and State) <br />Pump Station 0301 Sunny Isles Boulevard, Sunny Isles Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2014-2020 <br />23. PROJECT OWNER’S INFORMATION <br />A. PROJECT OWNER B. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER <br />HDR, Inc.Samantha La Hee, PE/Magdala Michel 305. 728.7416 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />25. Firms from section involved with this project <br />B.(1) FIRM NAME (2) FIRM LOCATION (City & State) (3) ROLE <br />Longitude Surveyors, LLC Doral, FL Surveying and Mapping <br /> STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />Longitude Surveyors performed a <br />Boundary/Topographic/Tree Survey for <br />PS 0301, to include right of way lines, <br />subdivision lines, section lines, lot <br />lines, base lines, and easement lines <br />required by project; set control points. <br />The Survey was referenced to the State <br />Plane Coordinate System; referenced <br />control points to perpetuate alignment; <br />provided horizontal and vertical <br />control; located and provided scientific <br />name for trees within limits; Longitude <br />prepared a Sketch to Accompany Legal <br />Description. <br />Cost <br />$XXX <br />Completed within <br />Budget & schedule <br />XXXX <br />Key Features <br />Boundary, Topographic & Tree <br />Survey for Pump Station <br />Sketch to Accompany Legal <br />Description
The URL can be used to link to this page
Your browser does not support the video tag.