My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction Engineering & Inspection (CEI) Svcs
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Construction Engineering & Inspection (CEI) Svcs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:15:47 AM
Creation date
8/21/2020 10:14:24 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F-9Proven solutions <br />Responsive and dependable performance <br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA) <br />References <br />CES is proud to have been delivering quality Engineering and <br />CEI solutions, excellent service, and on time/on budget project <br />delivery to numerous local agencies and municipalities, as both <br />a prime and subconsultant, for nearly 20 years. <br />20 Years of Experience Working with <br />Local Agencies and Municipalities <br />Work Performed / Firm Responsibility <br />The Miami-Dade County Water and Sewer Department <br />(WASD), in an effort to comply with the 2013 Consent <br />Decree and improve operation its wastewater collection <br />system to achieve compliance, established the Pump Station <br />Improvement Program. Under this program, WASD will repair <br />or replace over 140 existing and non-compliant wastewater <br />pump stations. The improvements vary from pump upgrades <br />to complete pump station and force main upgrades. <br />CES is providing the inspection/evaluation, analysis and <br />design for more than 30 sanitary sewer lift stations ranging <br />from 20 HP to 60 HP and associated force mains. Our team <br />is providing full design services, which includes surveying, <br />geotechnical engineering, civil engineering, mechanical <br />engineering, structural engineering, and electrical <br />engineering. The main complexities of these projects and <br />designs are the accelerated schedules required to meet the <br />Consent Decree schedules. The aggressive schedule requires <br />efficient project management and effective project controls. <br />Some of the projects included in the PSIP Task Orders include <br />the design of Pump Station Numbers: 609, 449, 147, 331, 440 <br />(Phase I), 440 (Phase II), 081, 592 (24-Inch Force Main), 672, <br />336, 1026, 1065, and 0596 . <br />MDWASD Pump Station Improvement Program <br />(Phase Ii), Miami-Dade County, FL <br />Miami-Dade County Water & Sewer Dept. <br />Reinaldo J. Rivera, PE <br />305.446.7450 / Reinaldo.Rivera@miamidade.gov <br />11 <br />Completion <br />Ongoing
The URL can be used to link to this page
Your browser does not support the video tag.