My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction Engineering & Inspection (CEI) Svcs
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Construction Engineering & Inspection (CEI) Svcs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:15:47 AM
Creation date
8/21/2020 10:14:24 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E-68Proven solutionsResponsive and dependable performance <br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA) <br />The City of Miramar is ranked among the top ten <br />fastest-growing cities in the United States. This growth <br />necessitated implementing major infrastructure <br />improvements in the eastern section of the City, <br />which is over 50 years old. The project area perimeter <br />included Miramar Parkway on the north, State Road 7 <br />on the east, County Line Road on the south, and SW <br />64th Avenue on the west, all of which encompassed <br />a total of 52 roadway segments. Approximately five miles of gravity sewer and approximately <br />five miles of water mains were upgraded to 6- and 8-inch DIP and constructed throughout <br />the area. The commensurate increase in wastewater flows also warranted the upgrade of a <br />local wastewater pump station. The pump station received new pumps, a new wet well, and <br />an updated electrical panel. CES provided engineering design services and construction <br />engineering and inspection services during the construction and installation of the following: <br /> »New water distribution mains <br /> »Construction of sanitary sewers <br /> »Installation of drainage <br /> »New sidewalk construction including ADA compliance <br /> »Pump station construction <br /> »Roadway resurfacing and reconstruction <br /> »Signage and street markings <br />Cost <br />$12M <br />Completed within <br />Budget & schedule <br />Yes <br />Key Features <br />Construction Engineering & <br />Inspection Services (CEI) <br />Civil Engineering Design <br />Water Distribution, Sanitary <br />Sewer Collection System & <br />Force Mains <br />Lift & Pump Station Design <br />Drainage & Storm Sewer <br />Roadway Resurfacing & <br />Reconstruction <br />Signage & Street Markings <br />Utility Coordination <br />Public Outreach <br />Permitting <br />Interagency Coordination <br />Construction Administration & <br />Inspections <br />25. Firms from section involved with this project <br />A. <br />(1) FIRM NAME (2) FIRM LOCATION (City & State) (3) ROLE <br />CES Consultants, Inc.Pembroke Pines, FL Civil Engineering, Utilities & Roadway Design, <br />QA/QC, Construction Services <br /> STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />F. Example projects which best illustrate proposed team’s qualifications for this contract <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br /> NUMBER <br />15 <br />21. TITLE AND LOCATION (City and State) <br />East Miramar Infrastructure Improvements, Phase I, Miramar, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2007 2010 <br />23. PROJECT OWNER’S INFORMATION <br />A. PROJECT OWNER B. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER <br />City of Miramar Roberto Ortiz, PE 305.704.4429 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
The URL can be used to link to this page
Your browser does not support the video tag.