My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craven Thompson & Associates, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craven Thompson & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:19:08 AM
Creation date
8/21/2020 10:17:24 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> STANDARD FORM 330 <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br /> 20. EXAMPLE PROJECT KEY <br /> NUMBER <br />6 <br />21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED <br />Royal Palm Estates Neighborhood Drainage <br />Improvements, Plantation, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2017 - 2019 2020 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br /> <br />a. PROJECT OWNER <br />b. POINT OF CONTACT NAME <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />City of Plantation Mr. Brett Butler, P.E. C.F.M. <br />Director of Engineering <br />Phone: (954) 797-2282 <br />Email: bbutler@plantation.org <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />Craven Thompson provided surveying, analysis, assessment for <br />repair/replacement of existing storm water management systems, <br />preparation of construction documents and permitting, bidding <br />assistance, and construction services for the Royal Palm Estates <br />Neighborhood. The neighborhood is 512 acres in size and is <br />bounded by the El Dorado Neighborhood to the north, SW 63rd <br />Avenue. to the east, S. University Drive to the west, and I-595 to the <br />south. <br />Improvements included: <br />▪ 12,080 linear feet of swale re-grading, <br />▪ 11,279 linear feet of storm pipe removal, <br />▪ removal of 177 storm drainage structures, <br />▪ the installation of 4,093 linear feet of 15” diameter storm <br />sewer, <br />▪ 2,483 linear feet of 18” diameter storm sewer, <br />▪ 4,691 linear feet of 24” diameter storm sewer, <br />▪ 371 linear feet of 30” diameter storm sewer, <br />▪ the removal and replacement of 3 outfalls, <br />▪ the installation of 154 – 30” diameter ADS drainage structures, <br />▪ 5 - type “C” catch basins, <br />▪ 5 - 4’ diameter drainage structures, <br />▪ and 10 - 5’ diameter drainage structures. <br />The project also included the dredging and re-shaping of 5,078 <br />linear feet of existing canals. Restoration of the disturbed right-of-way areas was also included. <br /> <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />a. <br />(1) FIRM NAME <br />Craven Thompson & <br />Associates, Inc. <br />(2) FIRM LOCATION (City and State) <br />3563 NW 53rd Street <br />Fort Lauderdale, Florida 33309 <br />(3) Role <br />Prime - Streetscape, Landscape Architecture, <br />Civil Engineering, Traffic, Drainage, CEI Services, <br />LAP <br />b. <br />(1) FIRM NAME <br />Tierra <br /> <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br /> <br />c. <br />(1) FIRM NAME <br /> <br /> <br /> <br />(2) FIRM LOCATION (City and State) (3) Role <br />d. <br />(1) FIRM NAME <br /> <br /> <br /> <br />(2) FIRM LOCATION (City and State) (3) Role <br /> <br />E | Page 98
The URL can be used to link to this page
Your browser does not support the video tag.