My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craven Thompson & Associates, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craven Thompson & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:19:08 AM
Creation date
8/21/2020 10:17:24 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR QUALIFICATIONS NO. 20-07-01 <br />CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) <br /> <br /> <br /> <br /> <br />TAB F: FIRM REFERENCES AND SIMILAR WORK COMPLETED <br /> <br />NE 14th Avenue Streetscape Improvements <br />Hallandale Beach, Florida <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Description of Work: <br />The project area is along NE 14th Avenue between <br />Hallandale Beach Boulevard and Atlantic Shores Boulevard. <br />The project corridor is approximately 3,400 linear feet. The <br />project includes: Mill and overlay entire roadway (including <br />pavement markings); on east side of NE 14th Avenue, mill <br />and overlay off-street parking (including pavement <br />markings) and provide new Type āDā curbed landscape bulb- <br />outs to delineate parallel parking and include canopy trees, <br />shrubs, groundcover and spray and drip irrigation; bike <br />lanes on both sides of roadway; curbing or other treatments <br />at existing driveway entrances; canopy trees with ground <br />cover intermingled and drip irrigation on the west side of NE <br />14th Avenue; landscape screening along north, south, and <br />west sides of the two (2) storm water pump stations. Please <br />note: Landscaping along the west side of the enclosure may <br />be limited due to the close proximity of the screen fence to <br />the existing sidewalk; PaveDrain concrete block access <br />drives on each side of the two (2) storm water pump <br />stations; mid-block crosswalks; and resting areas (benches, <br />trash cans, etc.). Craven Thompson & Associates, Inc. <br />provided surveying, landscape architectural, civil <br />engineering services, and CEI Services. <br /> <br />CLIENT CONTACT: <br />Mr. Manga Ebbe <br />Project Manager <br />City of Hallandale Beach <br />630 NE 2nd Street <br />Hallandale Beach, Florida 33009 <br />Phone: (954) 457-3043 <br />Fax: (954) 457-1624 <br />Email: mebbe@hallandalebeachfl.gov <br />CTA PERSONNEL ON PROJECT: <br />Patrick Gibney, P.E. <br />Douglas Taylor, P.E. <br />Don Shaver <br />James Sheddy <br />PROJECT DURATION: <br />2016 - 2018 <br /> <br /> <br /> <br /> <br /> <br /> <br />F | Page 3
The URL can be used to link to this page
Your browser does not support the video tag.