My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craven Thompson & Associates, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craven Thompson & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:19:08 AM
Creation date
8/21/2020 10:17:24 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR QUALIFICATIONS NO. 20-07-01 <br />CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) <br /> <br /> <br /> <br /> <br />TAB F: FIRM REFERENCES AND SIMILAR WORK COMPLETED <br /> <br />Stormwater Master Plan <br />North Miami Beach, Florida <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Description of Work: <br />Craven Thompson performed an operational analysis of all <br />sub-basins, control structures, and pump stations in relation <br />to the existing operational and maintenance procedures, <br />NPDES operational and maintenance requirements, and the <br />associated South Florida Water Management District <br />(SFWMD) and Miami-Dade County Environmental Resource <br />Management (RER- DERM) permit requirements. Analysis <br />shall include collection of permits from appropriate sources. <br />Recommendations for improvements to existing operational <br />and maintenance procedures are based on the operational <br />analysis. We performed a hydrologic analysis of all sub- <br />basins within the City utilizing the latest version of the <br />Interconnected Channel and Pond Routing (ICPR) computer <br />modeling program. The hydrologic analysis includes the 10, <br />25, and 100-year storm events, an ICPR Model for existing <br />conditions, and an ICPR Model for fully developed <br />conditions. <br /> <br /> <br /> <br /> <br /> <br /> <br />CLIENT CONTACT: <br />Ms. Judeen Johnson, P.E. <br />Director of Public Works <br />City of North Miami Beach <br />17050 NE 19th Avenue, 2nd Floor <br />North Miami Beach, Florida 33162 <br />Phone: (305) 948-2967 <br />Fax: (305) 957-3502 <br />Email: Judeen.Johnson@citynmb.com <br />CTA PERSONNEL ON PROJECT: <br />Patrick Gibney, P.E. <br />Luis Pimentel, P.E. <br />Douglas Taylor, P.E. <br />PROJECT DURATION: <br />2018 - 2020 <br /> <br /> <br /> <br /> <br /> <br />F | Page 5
The URL can be used to link to this page
Your browser does not support the video tag.