Laserfiche WebLink
REQUEST FOR QUALIFICATIONS NO. 20-07-01 <br />CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) <br /> <br /> <br /> <br /> <br />TAB F: FIRM REFERENCES AND SIMILAR WORK COMPLETED <br /> <br />Water and Sewer GIS Project <br />North Miami Beach, Florida <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Description of Work: <br />The purpose of the 25,600-Acre Service Area Project was to <br />provide the City with the complete GIS product of their water <br />and sanitary system. This involved the conversion of the <br />City’s existing water and sanitary sewer infrastructure, from <br />an AutoCAD drawing file format to the industry standard, <br />Environmental Systems Research Institute (ESRI) <br />Geographic Information System (GIS) format. The Project <br />included the entire North Miami Beach Utility service area. <br />The process included conversion of existing AutoCAD files, <br />into the same coordinate system as the GIS, so that future <br />updates will be more easily transferred between the two <br />systems, for updates and maintenance. The project <br />involved setting up a GIS Network file structure for the City <br />to insert existing and future documentation into, as well as, <br />adding GIS database information in the future. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />CLIENT CONTACT: <br />Mr. Karim L. Rossy <br />Development Engineer 3 <br />NMB Water/Jacobs <br />17050 NE 19th Avenue <br />North Miami Beach, Florida 33162 <br />Phone: (305) 948-2980 <br />Fax: (305) 957-3501 <br />Email: karim.rossy@jacobs.com <br />CTA PERSONNEL ON PROJECT: <br />Richard Pryce, P.S.M. <br />Nicholas Messina, Jr. P.S.M. <br />Ray Young, P.S.M. <br />David Reyes <br />PROJECT DURATION: <br />2014 - 2016 <br /> <br /> <br /> <br /> <br />F | Page 13