Laserfiche WebLink
REQUEST FOR QUALIFICATIONS NO. 20-07-01 <br />CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) <br /> <br /> <br /> <br /> <br />TAB F: FIRM REFERENCES AND SIMILAR WORK COMPLETED <br /> <br />Plantation Gardens Phase IIB Watermain Route Survey <br />Plantation, Florida <br /> <br />West Palm Beach, Florida <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Description of Work: <br />Plantation Gardens Phase IIB - is located generally between <br />Sunrise Boulevard, the Turnpike, Palm Tree Road, and Holly <br />Lane. Craven Thompson performed a topographic survey of <br />the right-of-way along the route of the proposed watermain. <br />This included all above ground improvements, and trees <br />larger than 3” in diameter. We also obtained rims and <br />inverts for all storm and sanitary structures along the <br />proposed route. <br />Improvements included: 18,000 linear feet of water main, <br />the installation of 31 new fire hydrants, and the installation <br />of 250 new water services. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />CLIENT CONTACT: <br />Mr. Daniel Pollio <br />Capital Improvements Administrator <br />City of Plantation <br />400 NW 73rd Avenue <br />Plantation, Florida 33317 <br />Phone: (954) 797-2209 <br />Fax: (954) 797-2157 <br />Email: dpollio@plantation.org <br />CTA PERSONNEL ON PROJECT: <br />Nicholas Messina, Jr., P.S.M <br />David Reyes <br />PROJECT DURATION: <br />September 2014 - March 2017 <br />CRAVEN THOMPSON’S FEES: <br />$306,902.00 <br />CONSTRUCTION COSTS: <br />Actual: $2,005,104.00 <br />Bid: $2,290,631.00 <br /> <br /> <br /> <br />F | Page 21