My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craven Thompson & Associates, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craven Thompson & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:19:08 AM
Creation date
8/21/2020 10:17:24 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR QUALIFICATIONS NO. 20-07-01 <br />CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) <br /> <br /> <br /> <br /> <br />TAB F: FIRM REFERENCES AND SIMILAR WORK COMPLETED <br /> <br />Davie Road Phase I - CEI Services <br />Davie, Florida <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Description of Work: <br />This project was for the construction engineering inspection <br />services to re-construct a public roadway known as Davie <br />Road Phase 1 within public right-of-way owned by Broward <br />County extending from the State Road 84 Right-of-Way to <br />Nova Drive. The length of the reconstruction was <br />approximately 2,640 linear feet. The primary intent was for <br />CTA to provide construction engineering inspection services <br />for the re-construction of the roadway. The construction <br />project consisted of pavement, base and sub-grade <br />reconstruction, curb & gutter construction, bike lane <br />construction, sidewalk construction, median construction, <br />driveway reconstruction within the R.O.W., drainage system <br />construction, landscaping & irrigation construction, <br />pavement marking & signage, traffic signal modification at <br />Reese Road and at Nova Drive, street lighting, and <br />coordination with utility companies. <br /> <br /> <br /> <br /> <br /> <br /> <br />CLIENT CONTACT: <br />Mr. Jon Vogt <br />Town Engineer <br />Town of Davie <br />6591 Orange Drive <br />Davie, Florida 33314 <br />Phone: (561) 797-1082 <br />Fax: (954) 797-1182 <br />Email: jonathan_vogt@davie-fl.gov <br />CTA PERSONNEL ON PROJECT: <br />Patrick Gibney, P.E. <br />Brian Tull <br />Don Shaver <br />James Sheddy <br />PROJECT DURATION: <br />2015 - 2016 <br />CONSTRUCTION COST: <br />$3,665,750.00 <br /> <br /> <br /> <br /> <br />F | Page 24
The URL can be used to link to this page
Your browser does not support the video tag.