My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craven Thompson & Associates, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craven Thompson & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:19:08 AM
Creation date
8/21/2020 10:17:24 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR QUALIFICATIONS NO. 20-07-01 <br />CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) <br /> <br /> <br /> <br /> <br />TAB F: FIRM REFERENCES AND SIMILAR WORK COMPLETED <br /> <br />El Dorado Neighborhood Drainage Improvement Project, <br />Plantation, Florida <br /> <br />West Palm Beach, Florida <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Description of Work: <br />Craven Thompson provided surveying, analysis, assessment <br />for repair/replacement of existing storm water management <br />systems, preparation of construction documents and <br />permitting, bidding assistance, and construction services for <br />the El Dorado Neighborhood. The neighborhood is 123 <br />acres in size and is bounded by the Plantation Golf Estates <br />Neighborhood to the northeast, W. Broward Blvd. to the <br />north, S. University Drive to the west, and the Royal Palm <br />Estates neighborhood to the south. <br />Improvements include: 3,072 linear feet of swale re-grading, <br />1,963 linear feet of storm pipe removal, the installation of <br />930 linear feet of 15” diameter storm sewer, 160 linear feet <br />of 18” diameter storm sewer, 768 linear feet of 24” <br />diameter storm sewer, 105 linear feet of 30” diameter <br />storm sewer, and the installation of 48 – 30” diameter ADS <br />drainage structures. Restoration of the disturbed right-of- <br />way areas was also included. <br /> <br /> <br /> <br /> <br />CLIENT CONTACT: <br />Mr. Brett Butler, P.E. C.F.M. <br />Director of Engineering <br />City of Plantation <br />401 NW 70th Terrace <br />Plantation, Florida 33317 <br />Phone: (954) 797-2282 <br />Fax: (954) 797-2761 <br />Email: bbutler@plantation.org <br />CTA PERSONNEL ON PROJECT: <br />Don Shaver <br />Brian Tull <br />PROJECT DURATION: <br />2017 - 2020 <br />CRAVEN THOMPSON’S FEES: <br />$140,360.00 <br /> <br /> <br />F | Page 31
The URL can be used to link to this page
Your browser does not support the video tag.