Laserfiche WebLink
<br /> STANDARD FORM 330 <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br /> <br />20. EXAMPLE PROJECT KEY <br /> NUMBER <br />12 <br />21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED <br />NE 29th Place (North) Roadway Improvements <br />Aventura, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2015 2016 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br /> <br />a. PROJECT OWNER <br />b. POINT OF CONTACT NAME <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />City of Aventura Mr. Joseph Kroll <br />Public Works/Transportation Director <br />Phone: (305) 466-8970 <br />Email: jkroll@cityofaventura.com <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />The project included surveying, design, permitting, and construction services for the milling and resurfacing of <br />existing roadway, installation of curb and gutter, pavement marking, signage, and traffic signal loops drainage <br />installation, cleaning and videoing of drainage system, sidewalk construction, tree removal and installation, and <br />light pole modifications on NE 29th Place (North) from Aventura Boulevard to NE 203rd Street. This includes <br />permitting through the City of Aventura Public Works Permit for work in the public right-of-way, and a Miami- <br />Dade County DERM Drainage Permit. Construction cost: $483,614.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />a. <br />(1) FIRM NAME <br />Craven Thompson & Associates, <br />Inc. <br />(2) FIRM LOCATION (City and State) <br />3563 NW 53rd Street <br />Fort Lauderdale, Florida 33309 <br />(3) Role <br />Prime – Surveying, Roadway Design & <br />Permitting Drainage Design, and CEI <br />Services <br />b. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) (3) Role <br />c. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) (3) Role <br />d. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role <br />e. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role <br />E | Page 31