|
<br /> STANDARD FORM 330
<br /> G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS
<br />
<br />26. NAMES OF KEY
<br />PERSONNEL
<br />(From Section E,
<br />Block 12)
<br />27. ROLE IN THIS
<br />CONTRACT
<br />(From Section E,
<br />Block 13)
<br />28. EXAMPLE PROJECTS LISTED IN
<br />(Fill in "Example Projects Key" section below before completing
<br />table. Place "X" under project key number for
<br />participation in same or similar role.)
<br />
<br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
<br />Patrick J. Gibney, P.E. Principal/Project Manager X X X X X X X X X X X X X X X X X X X X X X
<br />Timothy Hall, P.E. Civil Engineer X X X X
<br />Douglas R. Taylor, P.E. Civil Engineer X X X X X X X X X X
<br />Luis S. Pimentel, P.E. Civil Engineer X X X X X X X X X X
<br />Adolfo Gonzalez, P.E., LEED AP Civil Engineer X X
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F)
<br />1 NE 14th Avenue Streetscape Improvements
<br />Hallandale Beach, Florida 11 N-29A Canal Connector Project
<br />Davie, Florida 21 Polk Street Boat Ramp
<br />Hollywood, Florida
<br />2 North County Neighborhood Improvement Project, NE Quadrant,
<br />Bid Package 11, Broward County, Florida 12 NE 29th Place (North) Roadway Improvements
<br />Aventura, Florida 22
<br />6th Avenue South Roadway & Streetscape Improvements (between
<br />Federal & Dixie Highway)
<br />Lake Worth Beach, Florida
<br />3 NE 34th Court Complete Streets Project
<br />Oakland Park, Florida 13 Bluesten Park
<br />Hallandale Beach, Florida 23 Country Club Drive Milling & Resurfacing Project
<br />Aventura, Florida
<br />4 Oak Hammock Park
<br />Sunrise, Florida 14 NE 185th Street Turn Lane Extension
<br />Aventura, Florida 24 Stunson Nature Trail
<br />Oakland Park, Florida
<br />5 Sidewalk, Swale, Drainage & Roadway Improvements, Hallandale
<br />Beach, Florida 15 Miramar Historic Area Complete Streets Phase II
<br />Miramar, Florida 25 Garden Acres Neighborhood Improvements
<br />Oakland Park, Florida
<br />6 NE 38th Street Complete Streets Project
<br />Oakland Park, Florida 16 NE 207th Street Milling & Resurfacing Project
<br />Aventura, Florida 26 ADA Transition Plan
<br />North Miami Beach, Florida
<br />7 SW 36th Street Improvements
<br />Davie, Florida 17 City-Wide ADA Ramp Project
<br />Miami Springs, Florida 27 NW 10th Avenue Roadway & Streetscape Project
<br />Oakland Park, Florida
<br />8 Central Broward Water Control District – District Engineer, Davie,
<br />Florida 18 River Oaks Neighborhood Drainage Improvements,
<br />Fort Lauderdale, Florida 28 Miami Gardens Livable Neighborhoods – Vista Verde, Phases 1A & 1B,
<br />Miami Gardens, Florida
<br />9 Kimberly Boulevard East Complete Streets Project
<br />North Lauderdale, Florida 19 City of Miami Gardens Livable Neighborhood Improvement Project –
<br />Vista Verde Phases 1D, 2, and 3, Miami Gardens, Florida 29 Biscayne Lake Gardens Milling & Resurfacing Project
<br />Aventura, Florida
<br />10 Nob Hill Soccer Club
<br />Sunrise, Florida 20 NE 191st Street Drainage Improvements
<br />Aventura, Florida 30 Three Island Guardhouses and Traffic Calming Project, Hallandale
<br />Beach, Florida
<br />
<br />E | Page 50
|