Laserfiche WebLink
Project Approach and Understanding <br />project. The time for each activity will be assessed and the coordination and selection of the resources <br />and technical staff will be performed. Terracon understands that an important element for controlling <br />costs is good planning. <br />Terracon will comply with local regulations to request a utility <br />location service through Sunshine State One Call. We will consult <br />with the owner/client regarding potential utilities, or other unmarked <br />underground hazards. Based upon the results of this consultation, <br />we will consider the need for alternative subsurface exploration <br />methods, as the safety of our field crew is a priority. We will apply <br />for right-of-way (ROW) permits with the City/County Operation f <br />Center, setup maintenance of traffic (MOT) with certified subcontractors. Once all the permits and <br />clearances are in place, subsurface explorations will be performed using applicable ASTM methods. <br />Terracon has one of the largest and most diverse fleets of drilling equipment in Florida. By having this <br />equipment in-house, we can ensure quality control (QC) and quick turnaround in collecting subsurface <br />samples. <br />Our drill rigs are equipped with automatic hammers and include truck -mounted, ATV mudbug, track - <br />mounted (hydraulic mini -rig) with safety hammer, plus portable drilling tripods for extremely tight access <br />conditions and 1 20 -ton CPT rig. Once the field exploration is completed, the soil/rock samples will be <br />transported to our local Miami Lakes office which has a fully accredited laboratory by CMEC and Florida <br />Department of Transportation (FDOT). The soil samples will be classified by a geotechnical engineer and <br />necessary laboratory testing will be assigned. The laboratory testing will include and is not limited to <br />moisture content, organic content, grain size analysis, Atterberg limits and corrosion potential (pH, <br />sulfates, chlorides and resistivity). All tests will be performed in accordance with ASTM/AASHTO <br />methods. Based on the field exploration and laboratory results Terracon will provide geotechnical <br />recommendations for the proposed construction. <br />Our geotechnical reports will address the type of materials that can be used for backfill, the compaction <br />requirements for backfill, foundations, slabs, subgrade and base below pavements. In addition, it is <br />important to the contractor to identify if any hard material is anticipated while performing excavations. We <br />will ensure that sufficient information is provided to the contractor in order for them to design the <br />excavations in accordance with OSHA requirements and ensure that they use proper equipment. <br />Terracon will also provide soil/rock parameters that will assist in design of any excavations with sheet <br />piling. <br />In addition, in the predominantly urbanized City, impacts of vibrations and noise levels on adjoining <br />structures and utilities as well as the impacts of dewatering on adjacent properties will be considered <br />while providing recommendations. Terracon will provide information with regards to groundwater <br />conditions on the site and predicted seasonal high-water levels within the area which will assist in <br />determining the dewatering requirements. <br />1relrmcon City of Sunny Isles Beach — RFQ No. 20-07-011 Continuing Professional Consulting Services (CCNA) 10 <br />