My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ross Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Ross Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:04:54 AM
Creation date
8/21/2020 11:03:57 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Tab 5 E. Qualification Information and <br />Assigned Personnel <br />Continuing Professional Consulting Services <br />Request for Qualifications No. 20-07-01 <br />2-Civil Engineers <br />Miami-Dade County Water and Sewer Department Water Distribution and Sanitary Sewer <br />Pipeline Contract, Miami, FL (A Continuing Services Contract) <br />Other scope includes Permitting Services, Procurement Services and Construction Engineering <br />Inspection Services. Contract Amount $3.4M for 6 years with and optional 2-year extension for $1m <br />more. <br />Tasks have included: <br />Miami Dade County Water and Sewer Department NW 22nd Ave Wastewater Collection/Transmission <br />System Expansion and Water Distribution Systems Improvement for the North Sub-Basin (D2-C-1) - Ross <br />Engineering, Inc. assisted the Miami-Dade County’s Project Manager to design the wastewater collection <br />and transmission system and improve the potable <br />water distribution system to the commercial and <br />industrial parcels along the North Basin, north of NW <br />22nd Avenue. This design included 11,500 linear feet <br />of new 8” and 12” sewer main, 850 linear feet of force <br />main, and 5,800 linear feet of 8”, 10” and 12” <br />watermain along NW 22nd Ave. All the residents in <br />that area will be required to abandon their existing <br />septic systems and connect to the new sewer lateral <br />that will be designed for each house. Through this new <br />project, each property will be provided a new 6” <br />sanitary sewer lateral, new water meter and water <br />service that is connected to the new mains in the <br />street. Const. Amount: $4.4M <br />Miami Dade Water and Sewer Department Watermain Replacement <br />along Alhambra Circle – Ross Engineering, Inc. assisted the County’s <br />Project Manager to design 1,800 linear feet of new 8” dip watermain <br />to replace the existing 3” shallow pipeline in that area. Ross was also <br />responsible for all the utility locates in that area, MOT plans, <br />specification for Miami Dade Water and Sewer Department, <br />permitting and the cost estimate. The watermain had to be offset <br />from the median due to the large trees’ roots destroying the pipe. <br />Construction Amount: $315,000 <br />Page 14
The URL can be used to link to this page
Your browser does not support the video tag.