My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ross Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Ross Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:04:54 AM
Creation date
8/21/2020 11:03:57 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Tab 5 E. Qualification Information and <br />Assigned Personnel <br />Continuing Professional Consulting Services <br />Request for Qualifications No. 20-07-01 <br />2-Civil Engineers <br />Local Permitting Experience <br />Ross Engineering, Inc. has extensive experience with numerous permitting agencies within the Tri- <br />County area which include: <br />City of Sunny Isles Engineering Department <br />City of North Miami Engineering Department <br />City of North Miami Beach Engineering <br />Department <br />City of Hallandale Beach Engineering Department <br />City of Miami Beach Engineering Department <br />Miami Dade County <br />Miami Dade County Public Works Department <br />City of Miami Public Works Department <br />City of Miami Beach Public Works Department <br />Miami Dade County Water and Sewer <br />Department <br />Miami Dade County RER (Drainage Permit) <br />Miami Dade County REF (Water and Wastewater <br />Permit) <br />Miami Dade County Health Department <br />Miami Dade County Fire Department <br />City of Fort Lauderdale <br />Broward County Water and Wastewater <br />Broward County EDP <br />SFWMD <br />City of Hollywood <br />City of Weston <br />City of Pembroke Pines <br />City of Miami <br />City of Doral <br />City of Margate <br />City of Lauderhill <br />City of Delray Beach <br />Schedule and Budget <br />Scheduling: <br />We will begin by evaluating your required overall project schedule to make sure that realistic time is <br />included for design and program input from all stakeholders, verification of the budget, existing site <br />condition verification and other agency staff review. We will work with you to make sure that the <br />proposed schedule does not omit steps necessary to produce a high-quality project. Adequate time to <br />verify the program, evaluate design alternatives and to check costs is particularly important and can <br />prevent many problems later. <br />We prepare cost estimates from schematic design and throughout the process we continuously update <br />them and back check them to reflect current market conditions and trends. At the end of each design <br />stage - we review project budget vs. program to make sure our original assumptions and program have <br />not been altered to affect the outcome. During the construction documentation process, we will submit <br />updated cost estimates with all progress submittals, as well as a final bid tabulation set. We maintain a <br />database of projects recently bid so we can continuously compare and update our cost assumptions. <br />Page 21
The URL can be used to link to this page
Your browser does not support the video tag.