My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ross Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Ross Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:04:54 AM
Creation date
8/21/2020 11:03:57 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Tab 5 E. Qualification Information and <br />Assigned Personnel <br />Continuing Professional Consulting Services <br />Request for Qualifications No. 20-07-01 <br />2-Civil Engineers <br />Solutions may include: <br /> Increasing budget. <br /> Transferring budget allowances from one category to <br />another; and <br /> Reducing the estimated costs by reducing scope or by <br />substituting less expensive materials or systems if they <br />are approved by Sunny Isles Beach. <br />Ross will perform a project kick-off meeting at the beginning of <br />each task. The staff invited will include the City’s Project <br />Manager/Engineer, end-users, and any other stake holders <br />with a vested interest in the project. <br />Our key personnel have gained first-hand knowledge of location conditions, design standards, local <br />permitting requirements, stakeholder and public outreach concerns, multi-agency coordination needs, <br />and we strive to exceed the expectations of all involved. <br />Page 23
The URL can be used to link to this page
Your browser does not support the video tag.