Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Samiksha Poudel, EIT <br />13. ROLE IN THIS CONTRACT <br /> Project Engineer <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />5 <br />b. WITH CURRENT FIRM <br /> 1 <br />15. FIRM NAME AND LOCATION (City and State) <br />Ross Engineering, Inc., Miami, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />B.S in Civil Engineering and Infrastructure <br />George Mason University, Fairfax, VA – 2017 <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />EIT #0420070186 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Computer skills: AutoCAD, AutoCAD Civil 3D, ICPR, HydroCAD, HEC-RAS and Maximo <br /> AWWA-Risk and Resilience Certified <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />City of North Miami- America’s Water Infrastructure Act: Risk & Resilience <br />North Miami, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 - 2020 <br />CONSTRUCTION (If applicable) <br />NA <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Ms. Poudel created the new risk assessment and emergency response plan requirements for the community water systems of the City of North <br />Miami with respect to AWIA 2018 requirements. Several meetings and close coordination with City of North Miami was done in order to compile a <br />comprehensive list of all their assets and possible risks and how to safeguard against any natural or malevolent threats. Contract Amount: <br />$150,000 Role: Project Engineer <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Miami Dade County Jackson Memorial Hospital Stormwater Master Plan <br />Miami, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 - 2020 <br />CONSTRUCTION (If applicable) <br /> NA <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Ms. Poudel was the Project Engineer that created the Stormwater Master Plan for Jackson Memorial Hospital. The model included basin analysis of <br />the existing conditions done by using a comprehensive topographic survey of the entire Jackson property. Modeling software used was ICPR 4 in <br />order to analyze the site’s existing condition. Drainage report will be provided to Jackson with recommendation and cost estimate for proposed <br />improvements. Contract Amount: $35,000 Role: Project Engineer <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Miami Palmetto Senior High School <br />Miami, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 - 2021 <br />CONSTRUCTION (If applicable) <br />2019 - 2021 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Ms. Poudel assisted on the final permitting and certification of the 120,900 SF of new phased construction for the 18-acre High School. The scope <br />of work for this project included new administrative offices, student services, labs, new art wing, music room and black box theater, new cafeteria <br />building, technology labs, and an indoor and outdoor dining facility adjacent to a central courtyard. The proposed phased project also included <br />drainage, water, fire line and gravity sanitary sewer system design and constructions and other miscellaneous upgrades throughout. Phase 1 of the <br />construction has been completed. Const. Cost: $40M Role: Project Engineer <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Florida Power and Light Martin Terminal <br />Riviera Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 - 2020 <br />CONSTRUCTION (If applicable) <br />2020 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Ms. Poudel was the Project Engineer who created the site demolition plan, grading and drainage plans with drainage report for the project. ICPR 4 <br />Modeling software was used to analyze the site’s pre-condition and post condition with respect to new proposed grading. The drawdown for the <br />drainage area would be less than 25 hours, reducing the chances of mosquito breeding for the site. Currently under construction Contact Amount: <br />$42,250 Role: Project Engineer <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Miami Dade County Water and Sewer Department - Small Diameter Contract NW <br />22nd Ave., Miami Dade County, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br /> 2019 - 2023 <br />CONSTRUCTION (If applicable) <br /> 2021 - 2023 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Ms. Poudel assisted the Project Manager with the design the wastewater collection and transmission system and improve the potable water <br />distribution system to the commercial and industrial parcels along the North Basin, north of NW 22nd Avenue. Ms. Poudel assisted with the plan <br />and profiles of the wastewater system in civil 3D. This design included 11,500 linear feet of new 8” and 12” sewer main, 850 linear feet of force <br />main, and 5,800 linear feet of 8”, 10” and 12” watermain along NW 22nd Ave. All the residents in that area will be required to abandon their <br />existing septic systems and connect to the new sewer lateral that will be designed for each house. Through this new project, each property will be <br />provided a new 6” sanitary sewer lateral, new water meter and water service that is connected to the new mains in the street. Const. Costs: $8.5M <br />Role: Project Engineer Page 39