My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ross Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Ross Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:04:54 AM
Creation date
8/21/2020 11:03:57 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY NUMBER <br />8 <br />21. TITLE AND LOCATION (City and State) <br />Miami Palmetto Senior High School <br />Miami, FL <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If applicable) <br />2021 (Est.) <br />23.PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER <br />Miami Dade County Public Schools <br />b. POINT OF CONTACT NAME <br />Arnaldo Delgado/Prime: Zyscovich <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />305-372-5222 <br />Melissa Ross was Project Manager and Robert <br />Ross was Engineer of Record/Principal in Charge <br />120,900 SF of new construction including <br />administrative offices; student services; <br />vocational labs, new art wing, photo studio lab, <br />gymnastics space, dance room, music room, and <br />black box theater; new cafeteria building, <br />technology labs, and an indoor and outdoor <br />dining facility adjacent to a central courtyard. The <br />remaining buildings will be remodeled and <br />renovated. Renovations include new central chiller plant; <br />electrical and mechanical upgrades; classroom technology. <br />Project also included drainage, water, fire line and gravity <br />sanitary sewer system design and constructions and other <br />miscellaneous upgrades throughout. <br />In the end, the 120,900 SF of new construction will add capacity <br />for only 90 more students, but the number of classrooms goes <br />up and the educational environment is significantly improved. <br />Ross Engineering, Inc. designed the drainage, water, fire line <br />and gravity sanitary sewer system for the multi-phased school <br />now under construction. <br />5. Firms from Section C Involved with this Project <br />a. <br />(1) Firm Name <br />Ross Engineering, Inc. <br />(2) Firm Location (City and State) <br />Miami, FL <br />(3) Role <br />Civil Engineering <br />b. <br />(1) Firm Name (2) Firm Location (City and State)(3) Role <br />Page 47
The URL can be used to link to this page
Your browser does not support the video tag.