Laserfiche WebLink
Universal Engineering Sciences | 31 <br />E. Qualification Information and Assigned Personnel <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) <br />a. PROJECT OWNER <br />21. TITLE AND LOCATION (City and State) <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />20. EXAMPLE PROJECT KEY <br /> NUMBER <br />a. <br />b. <br />c. <br />d. <br />e. <br />f. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />(3) ROLE <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />b. POINT OF CONTACT NAME <br />23. PROJECT OWNER'S INFORMATION <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)Venetian Islands Bid Package 13C (Miami Beach, FL)2019 <br />Universal Engineering Sciences <br />The project consisted of installing water mains to improve residential service, drive was improvements, <br />roadway reconstruction, pump stations, outfall pipes, seawall restoration, hardscape, lighting, and <br />landscape improvements. <br />UES provided materials testing for this project that was under construction on all three islands. <br />To date, UES has performed in-place density testing on backfill, field plastic property testing of <br />concrete, casting specimens of concrete used in production, asphalt coring for thickness and unit <br />weight determination, laboratory compaction testing, laboratory compressive strength testing, soil <br />classification, and providing signed/sealed reports of findings. The set schedule requires an all day <br />technician everyday with weekly project management communication. <br />UES has also been retained by the City to perform geotechnical exploration in areas of proposed pump <br />stations for the purpose of developing geotechnical foundation recommendations to support the <br />proposed structures. Since the islands are man-made with dredged materials, helical pile foundations <br />were recommended to support the proposed pump stations in order to limit settlement to tolerable <br />limits. <br />Narvel Lassiter 678-618-0212 <br />N/A <br />6 <br />Medley, Florida Pile Inspections, Load Tests, <br />Materials Testing, and Threshold <br />Westrec Haulover Equities