Laserfiche WebLink
12. NAME 13. ROLE IN THIS CONTRACT <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />14. YEARS EXPERIENCE <br />b. WITH CURRENT FIRMa. TOTAL <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) <br />15. FIRM NAME AND LOCATION (City and State) <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />a. <br />b. <br />c. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />e. <br />Check if project performed with current firm <br />Check if project performed with current firm <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />Check if project performed with current firm <br />Check if project performed with current firm <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />19. RELEVANT PROJECTS <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Thomas Pierro, PE, D.CE <br />Coastal Protection Engineering LLC, Boca Raton, Florida <br />Master of Science, Ocean Engineering, Florida Atlantic <br />University <br />Bachelor of Science, Ocean Engineering, Florida Atlantic <br />University <br />Recipient: Jim Purpura/T.Y. Chiu Award from FSBPA for outstanding contribution to coastal engineering in State of Florida <br />Member: American Society of Civil Engineers (ASCE), Florida Shore and Beach Preservation Association (FSBPA), <br />American Shore and Beach Preservation Association (ASBPA) <br />Town of Palm Beach Coastal Program (Town of Palm Beach, FL) <br />Principal Engineer/Project Manager. Mr. Pierro has worked on many facets of the Town’s coastal program since 2006 <br />with former and current firms. He recently served as project manager for the Town’s Mid-Town Beach Nourishment <br />Project, which was constructed with FCCE funds from March - May 2020. The project was constructed from March - May <br />2020, placing approximately 700,000 cy of sand and utilizing three hopper dredges and specialized screening equipment. <br />Principal Engineer/Project Manager. Mr. Pierro supports the County’s island-wide shore protection program including the <br />federal and county-managed projects, including an ongoing Inlet Management Study for Passage Key Inlet, which is the <br />primary sand source for the Anna Maria Island beach nourishment program. Mr. Pierro is currently supporting the <br />federal project that is under construction and leading the design of the upcoming FEMA funded Coquina Beach project. <br />Principal Engineer/Project Manager. Mr. Pierro has assisted with Delray Beach’s Federal Storm Damage Reduction <br />Project since 2006 with former and current firms. He served as Project Manager and EOR for the 5th Beach <br />Renourishment Project constructed in 2013 and continues to oversee the management of City’s program in coordination <br />with City, County, and USACE on storm repair projects and planning for the 6th Periodic Beach Renourishment in 2021. <br />Mr. Pierro has worked on City of Sarasota projects for over 12 years with former and current firms and served as Project <br />Manager and Senior Engineer for Lido Key beach nourishments, including multiple FEMA supported storm damage <br />repair projects. He developed a numerical model to evaluate the effects of dredging New Pass ebb shoal and support <br />permitting. He was the EOR for the 2018/19 nourishment and is currently supporting the Corps with the HSDR project. <br />Principal Engineer. Mr. Pierro has worked on the City’s coastal program for over 10 years with former and current firms. <br />His has acted in an advisory role on the Beach Management Plan, which included several meetings with the City’s <br />Marine Advisory Board and conceptualizing the components of the plan for further development and implementation. He <br />maintains a positive relationship with City staff and offers responsive service and sound advice for coastal matters. <br />Manatee County Coastal Management Program (Bradenton, FL) <br />City of Delray Beach Coastal Program (Delray Beach, FL) <br />Lido Key Beach Nourishment Program (Sarasota, FL) <br />City of Deerfield Beach Coastal & Waterway Program (Deerfield Beach, <br />FL) <br />Florida, Professional Engineer, Civil <br />New York, Professional Engineer, Civil <br />Nationwide, Diplomate, Coastal Engineering (ACOPNE) <br />Principal Engineer/Project Manager 19 1 <br />✔ <br />✔ <br />✔ <br />✔ <br />✔ <br />ongoing 2020 <br />ongoing 2020 <br />ongoing <br />2020ongoing <br />upcomingongoing <br />2019, upcoming