Laserfiche WebLink
h. <br />19. RELEVANT PROJECTS (CONT.) <br />f. <br />e. <br />d. <br />g. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 RezA ShAMS <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firm <br />Car Rental and CS east Concourse Miami Intermodal Center <br />Oakland Park, Florida <br />Project FM # 249937-5-52-01 & 406800-2-52-03 <br />CSS. This project spanned 10 years and consisted of 3 million sq ft of floor space with a terminal quality customer service lobby, multi- <br />floor refueling system, associated ramp structures tying into a rental car center including a CC2 bridge with curved steel superstructure <br />on driven piles, MSE walls, rigid pavement for bus station parking areas, lighting & signalization. Cost $600 Million <br />2006 2006 <br />Miami-Dade Transit (MDT); earlington heights Connector Miami Intermodal Center <br />Miami-Dade, Florida <br />Structural Inspector. This gateway project included 2.5 miles of elevated bridges that combined segmental and U-Beams with all transit <br />system facilities. Cost $500 Million <br />2009 2009 <br />105