Laserfiche WebLink
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS <br />26. NAMES OF KEY <br />PERSONNEL <br />(From Section E, <br />Block 12) <br />29. EXAMPLE PROJECTS KEY <br />NO.NO.TITLE OF EXAMPLE PROJECT (From Section F)TITLE OF EXAMPLE PROJECT (From Section F) <br />27. ROLE IN THIS <br />CONTRACT <br />(From Section E, <br />Block 13) <br />28. EXAMPLE PROJECTS LISTED IN SECTION F <br />(Fill in “Example Projects Key” section below before completing <br />table. Place “X” under project key number for <br />participation in same or similar role.) <br />STANDARD FORM 330 (REV. 8/2016) - SF330-G_CGA_MATRix <br />26 <br />27 <br />28 <br />29 <br />3025 <br />24 <br />23 <br />22 <br />21 <br />30292827262524232221 <br />Project AdministratorHugo DaSilvia, PE x x x x <br />Project AdministratorFelix Garcia, PE x x x x <br />Project AdministratorBernnon Artola x x x <br />PiO/Landscape inspectorErin Sudman x x x x <br />Senior inspectorReynaldo Alfonso x x x x <br />Senior inspectorLance Robinson x x x <br />Senior inspector/Senior Bridge <br />inspectorGary Craig x x x <br />Senior inspectorJulio Antonio x x x x <br />inspectorVictor Murphy x x x <br />Assistant PA/CSSReza Shams x x x <br />Page 3 of 3 <br />Seawall Replacement Beachwalk ii Phase ii from 3rd St to 5th St (LAP Funded) <br />Sunny isles Beach Emergency Seawall Replacement Collins Avenue (SR A1A) Decorative Lighting <br />Miscellaneous Engineering Services - Dania Beach Various General CEi Consultant Construction Support D4 <br />Engineering Services - Bal Harbour Village CEi Continuing Service Contract <br />Davie Road Phase i and ii Districtwide Miscellaneous CEi inspection Services <br />141