|
STANDARD FORM 330 (REV. 8/2016)
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Raj Krishnasamy, P.E.
<br />13. ROLE IN THIS CONTRACT
<br />Principal-in-Charge, Principal Engineer
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />33
<br />b. WITH CURRENT FIRM
<br />20 15. FIRM NAME AND LOCATION (City and State) TIERRA SOUTH FLORIDA, INC. (TSF) West Palm Beach, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) BS Civil Engineering, Christian Brothers University, 1987 MS Civil Engineering, University of Memphis, 1996
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer, Florida No. 53567
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) American Society of Highway Engineers, Past President, Florida Engineering Society, Past Treasurer Geotechnical Material Engineering Council, Past Chairman
<br /> 19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Gateway Park Pedestrian Bridge,
<br />City of Sunny Isles Beach, Florida
<br />(2) YEAR COMPLETED PROFESSIONAL SERVICES 2014
<br />CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Krishnasamy was the Principal-in-Charge of the Geotechnical Engineering Services for the Gateway Park Pedestrian Bridge located in The City of Sunny Isles, Florida. The project consists of the construction of a new pedestrian bridge over State Road No. 826 Westbound. The purpose of this study was to explore the subsurface conditions within or in close proximity to the pedestrian bridge to enable an evaluation of foundations for the construction. Provided a geotechnical engineering report including geotechnical evaluations and recommendations regarding foundation, bridge, pile monitoring and construction considerations regarding excavations. Completed on time and within budget.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Samson Oceanfront Park,
<br />City of Sunny Isles Beach, Florida.
<br />(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Krishnasamy was the Principal-in-Charge of the Auger-Cast Pile Inspection and Construction Material Testing Services for the Samson Oceanfront Park located in the City of Sunny Isles Beach, Florida. The project consists of a compact beach park with a playground, pavilion and showers. A TSF Senior Engineer provided review of daily reports, handled project coordination and attended meetings as necessary. Completed on time and within project.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />SW 42 Street (Bird Road Extension) From SW 162 Avenue to SW 157
<br />Avenue, Miami-Dade County, Florida
<br />(2) YEAR COMPLETED PROFESSIONAL SERVICES 2020
<br />CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Krishnasamy was the Principal-in-Charge of the Geotechnical Engineering Services for the widening project of Bird Road Extension from SW 162nd Ave to SW 15th Avenue in Miami-Dade County. The roadway limits are approximately 3,100 lineal feet in length. Provided a geotechnical engineering report including geotechnical evaluations and recommendations regarding permanent cut and fill slopes, excavations, groundwater control, pavement design considerations, and on-site suitability. Completed on time and within budget.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Biscayne National Park,
<br />Convoy Point/Adams Key, Biscayne Keys, Florida
<br />(2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Krishnasamy was the Principal-in-Charge of the Geotechnical Engineering Study for the Biscayne National Park located in the Biscayne Keys, Florida. The project consists of design repairs and replacements that address the hurricane impact damage caused by Hurricane Irma and Maria. The study was performed to obtain information on the existing subsurface conditions within the site improvements to assist in the design and preparation of construction plans. Provided a geotechnical engineering report including the results of the subsurface exploration. Completed on time and within budget.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Vista Verde Phase 4, Roadway and Drainage Improvement,
<br />City of Miami Gardens, Florida.
<br />(2) YEAR COMPLETED PROFESSIONAL SERVICES 2020
<br />CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Krishnasamy was the Principal-in-Charge of the Geotechnical Engineering Services for the Vista Verde Phase 4 located in the City of Miami Gardens, Florida. The project consists of roadway and drainage improvements, and pavement design. The purpose of this study was to explore the subsurface conditions at the site to enable an evaluation of acceptable construction and site development considerations. Provided a geotechnical engineering report including geotechnical evaluation and recommendations regarding excavations, trench backfill, and preconstruction conditions survey. Completed on time and within budget.
<br />191
|