My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin, Giordano & Associates, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Calvin, Giordano & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:17:20 AM
Creation date
8/21/2020 11:14:55 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARD FORM 330 (REV. 8/2016) <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br /> NUMBER <br />2 <br />21. TITLE AND LOCATION (City and State) <br />Biscayne National Park, <br />Convoy Point/Adams Key, Biscayne Keys, Florida. <br />22. YEAR COMPLETED PROFESSIONAL SERVICES <br />2020 <br />CONSTRUCTION (If applicable) <br />23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Miami-Dade County Parks, Recreation and Open Spaces c/o Jacobs <br />b. POINT OF CONTACT NAME Ms. Rita Donnell <br />c. POINT OF CONTACT TELEPHONE NUMBER (720) 286-1572 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> TSF performed a Geotechnical Engineering Study for the Biscayne National Park located in the Biscayne Keys, Florida. <br /> The project consists of design repairs and replacements that address the hurricane impact damage caused by Hurricane Irma and Maria. <br /> The study was performed to obtain information on the existing subsurface conditions within the site improvements to assist in the design and preparation of construction plans. <br /> TSF’s geotechnical field study included SPT borings; Classified soil samples in the laboratory using the Unified Soil Classification System. <br /> Provided a geotechnical engineering report including the results of the subsurface exploration. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME TSF <br />(2) FIRM LOCATION (City and State) West Palm Beach, FL <br />(3) ROLE Geotechnical Engineering Services <br /> <br /> <br /> <br /> <br /> <br />195
The URL can be used to link to this page
Your browser does not support the video tag.