My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin, Giordano & Associates, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Calvin, Giordano & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:17:20 AM
Creation date
8/21/2020 11:14:55 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c. <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete One Section E for Each Key Person.) <br />12. NAME <br />16. EDUCATION (Degree and Specialization) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />15. FIRM NAME AND LOCATION (City and State) <br />13. ROLE IN THIS CONTRACT <br />a. TOTAL b. WITH CURRENT FIRM <br />14. YEARS OF EXPERIENCE <br />19. RELEVANT PROJECTS <br />a. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 HugO DASilvA <br />HUGO DASILVA, PE <br />Calvin, giordano & Associates, inc. <br />Bachelor of Science in Civil Engineering, Polytechnic Professional Engineer - Florida <br />Professional Engineer - Puerto Rico <br />Fort Lauderdale, FL <br />University Hato Rey, Puerto Rico No. 73249 <br />No. 11999 <br />TIN#D241325671890 <br />CTQP:Asphalt Paving Level 1;Asphalt Paving Level 2;Earthwork Level 1;Earthwork Level 2;ACI Concrete Field Testing 1;Drill Shaft;Final <br />Estimates Level 1;Final Estimates Level 2; Advanced MOT;LIMS Training; Nuclear Gauge Safety;IMSA Traffic Signal Inspector Level 1;OSHA <br />10hr; Stormwater, Erosion and Sedimentation Control <br />PROJECT ADMINISTRATOR 25 5 <br />SW 36th Avenue Sidewalk improvements; FM #431715-1-58-01 <br />Pompano Beach, Florida <br />Project Administrator/Senior Inspector. The project scope includes the installation of a sidewalk along the west side of SW 36th Avenue <br />commencing on the south end of Canal “A” north to Palm Aire Drive, a pedestrian flashing beacon crosswalk at the intersection of <br />SW 36th Avenue and Gateway Drive, storm drainage construction, demolition, utility work, and permanent signage & striping. Cost: <br />$628,755.50 <br />2016 2017 <br />NW 110th Avenue Road improvements (lAP Funded $1,495,915.00) <br />Coral Springs, Florida <br />Project FM # 435088-1-58-01 <br />Project Administrator. Project elements included narrowing existing 12-ft travel lanes to 11 ft and constructing a 6-ft wide sidewalk, a 4-ft <br />bicycle lane, drainage structure installation and curbing, valley gutter was removed and restored. Roadway was milled and resurfaced, <br />landscaping, sidewalk and irrigation lines repaired. All improvements were constructed within City of Coral Springs right of way (ROW). <br />Cost $1,599,491.63 <br />2017 2018 <br />victoria Park Ph A (Project No. 10850) & victoria Park Ph B (Project No. 11901) <br />Fort Lauderdale, Florida <br />Project Administrator. Elements include; installing approximately 60,000 feet of 6-inch and 8-inch watermain to replace existing 2-inch <br />mains, including new fire hydrants, service connections to each home, & repaving of the roads impacted by the watermain improvements. <br />Also includes all restoration to landscaping, lawns, pavers, etc. that may have been disturbed due to the work. Cost $11 Million <br />2019 2019 <br />86
The URL can be used to link to this page
Your browser does not support the video tag.