<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete One Section E for Each Key Person.)
<br />12. NAME
<br />16. EDUCATION (Degree and Specialization)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />15. FIRM NAME AND LOCATION (City and State)
<br />13. ROLE IN THIS CONTRACT
<br />a. TOTAL b. WITH CURRENT FIRM
<br />14. YEARS OF EXPERIENCE
<br />19. RELEVANT PROJECTS
<br />a.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />STANDARD FORM 330 (REV. 8/2016) - SF330 ERiN SuDMAN
<br />ERIN SUDMAN
<br />Calvin, Giordano & Associates, inc.
<br />Bachelor of Landscape Architecture Landscape inspectors Association of Florida Certificate
<br />Fort Lauderdale, FL
<br />University of Florida, Gainesville, Florida No. 2018-0215
<br />TIN#S355213817850
<br />CTQP: Final Estimates Level 1; Final Estimates Level 2; OSHA 10 Hr Construction Training Course; Security Awareness Course; Stormwater,
<br />Erosion and Sedimentation Control; FDOT LAP Checklist Training; Intermediate MOT; LIAF Landscape Inspector
<br />PIO/LANDSCAPE INSPECTOR 13 10+
<br />SW 36th Avenue Sidewalk Project (W McNab Rd to W Palm Aire Dr)
<br />Pompano Beach, Florida
<br />Project FM # 431715-1-58-01
<br />Resident Compliance Specialist/CSS. The project scope included the installation of a sidewalk along the west side of SW 36th Avenue
<br />commencing on the south end of Canal “A” north to Palm Aire Drive, a pedestrian lashing beacon crosswalk at the intersection of SW 36th
<br />Avenue and Gateway Drive, storm drainage construction, demolition, utility work, and permanent signage & striping. Cost $ 689,618.00
<br />2016 2017
<br />NW 110th Avenue Road improvements; Project FM #435088-1-58-01 (LAP Funded)
<br />Pompano Beach, Florida
<br />RCS/CSS/Landscape Inspector.Project elements included narrowing existing 12-ft travel lanes to 11 ft and constructing a 6-ft wide
<br />sidewalk, a 4-ft bicycle lane, drainage structure installation and curbing, valley gutter was removed and restored. Roadway was milled
<br />and resurfaced, landscaping, sidewalk and irrigation lines repaired. All improvements were constructed within City of Coral Springs right
<br />of way (ROW). Cost $1,599,491.63
<br />2017 2018
<br />Hard Rock Stadium Pedestrian Bridges and Tunnels
<br />Miami Gardens, Florida
<br />Project FM #’s 440858-1-58-01/440858-2-54-01
<br />RCS/CSS/Landscape Inspector.2 pedestrian bridges over TPK exit ramp & NW 199 St,2 tunnels under Don Shula Dr. Included: pile
<br />foundations, MSE walls, drainage improvements, lighting, signalization improvements, signage & pavement markings, precast concrete,
<br />curb & gutter, ADA sidewalk/ramps,landscaping,sod,irrigation,parking lot resurfacing, striping, and signing. plus pre-stressed, pre-cast
<br />concrete tunnel segments, sheet piles. Super Bowl 2020. Cost $17 Million.
<br />2019 2019
<br />92
|