Laserfiche WebLink
<br /> <br />RELEVANT EXPERIENCE <br /> <br />Project Name: Roadway Improvements to NW <br />58th Street from NW 97th Avenue <br />to SR-826, Miami, FL <br /> <br />Client’s Name: Miami-Dade County <br />Roadway Engineering & Right-of- <br />Way Division <br />Mr. Leandro Oña, Chief <br />305-375-1909 <br />Fax 305-372-6064 <br />Ljo@miamidade.gov <br /> <br />Type of Facility or <br />Services: <br />Roadway Improvements <br /> <br />SRS Project Fees: <br /> <br />$ 361,372 <br /> <br />Project Dates: <br /> <br />Outcome: <br /> <br /> <br />Consultant Role: <br /> <br />2016 to 08-2017 <br /> <br />All design projects completed <br />successfully <br /> <br />Prime/Civil Engineer <br /> <br /> <br />Key Individuals <br />Involved: <br />Ignacio Serralta, P.E. <br />Jean-Claude Fontaneau, EI <br /> <br />Project Description: <br /> <br />The scope of services includes engineering design and post- <br />design services for the preparation of construction documents <br />to include master planning and public involvement for the <br />reconstruction of the existing road to a 4-lane roadway with a <br />continuous center turning lane. The two miles of improvements <br />will also include bike lanes, sidewalks, curbs and gutters, <br />storm drainage system, pavement marking and signage along <br />with upgrades to traffic signalization, roadway lighting, to <br />include environmental permitting and construction <br />administration services. <br /> <br /> <br />87