Laserfiche WebLink
<br />RFQ-20-07-01 <br />Continuing Professional Consulting Services (CCNA) <br /> <br /> 15800 Pines Blvd, Suite 340, Pembroke Pines FL 33172 <br /> Tel:(786) 456-7700 (954) 658-5232 3 <br /> <br />Project Name: DDA Complete Streets: SW /SE 1st Street – City of Miami <br />(2016-2017) <br /> <br /> <br /> <br />Description: Provided traffic engineering services as part of <br />feasibility study to apply Complete Streets concepts. Provided existing <br />conditions analysis, traffic analysis for no build and build conditions, <br />transit system operation analysis. Study recommended lane elimination <br />and 1st bus preferential lane only in Miami-Dade County. Responsible <br />for design to apply a Complete Streets concept; included provided <br />signing & pavement marking plans including bike lane and bus <br />preferential lane. Responsible for before-after study evaluation of Complete Streets concept; included survey, <br />traffic and non-motorized data collection, safety evaluation, travel time for vehicular and transit. <br /> <br />Client: Miami Downtown Development Authority <br /> 200 S. Biscayne Blvd., Suite 2929, Miami, FL 33131, <br />Patrice Smith, 305-379-6575 <br /> <br />Fee: 59,000.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />